Technical guideFree to read2026

Experimental Assessment of the Fire Protection Systems Performance of Data Centers

Efectis

A 2026 technical note from fire-testing laboratory Efectis: compliance with EN 12845, EN 14972 or EN 15004 alone is not always enough, and detection, smoke and suppression in high-airflow data centres should be shown by test.

On this page

Overview

Efectis's short technical note lists what makes data-centre fire safety hard: high equipment density, cables, UPS systems, in some cases lithium-ion batteries, and very high availability requirements. The strategy has to combine very early detection, limiting fire spread and effective suppression that minimises equipment damage and service interruption.

The note recalls the standards used for fixed automatic suppression: EN 12845 (or NFPA 13) for sprinklers, EN 14972 (or NFPA 750) for water mist, and EN 15004 and ISO 14520 for gaseous systems. For battery energy storage systems, NFPA 855 and UL 9540A are the current references. The note argues that compliance with standards does not always show the real performance of an installation, because data-centre configurations vary widely and high-airflow cooling and ventilation can significantly affect detection, smoke propagation and suppression effectiveness.

The proposed approach complements the standards-based method with performance-based fire safety engineering: technical expertise, engineering studies, numerical calculations and experimental testing. Tests can range from a single sprinkler head or water mist nozzle to full-scale fire tests of a single server rack, several IT cabinets, or part or all of an IT room. Measurements cover temperature, heat flux, smoke and gas concentrations, detection and activation times, spread to adjacent equipment, control or extinguishment time and damage to IT equipment. The approach matters most for innovative facilities or configurations outside the scope of existing standards.

Key points

  1. Fire risk sources in data centres: high equipment density, cables, UPS systems and, in some facilities, lithium-ion batteries.
  2. Standards referenced: EN 12845 (NFPA 13) for sprinklers, EN 14972 (NFPA 750) for water mist, EN 15004 and ISO 14520 for gaseous systems, NFPA 855 and UL 9540A for BESS.
  3. Compliance with standards alone does not always demonstrate the real performance of an installation.
  4. High-airflow cooling and ventilation can significantly influence detection, smoke propagation and suppression effectiveness.
  5. Four complementary areas: technical expertise, engineering studies, numerical calculations and experimental testing.
  6. Test scales: single component (sprinkler head, water mist nozzle), single rack, several IT cabinets, part or all of an IT room.
  7. Measurements: temperature, heat flux, smoke and gas concentrations, detection and activation times, spread, extinguishment time, IT damage.
  8. Experimental data also validate numerical models used to extrapolate to larger or more complex configurations.

Using it in design

  • For halls with high cooling and ventilation airflow, verify detection and suppression design not only against standard requirements but by examining how airflow affects smoke and agent distribution.
  • For configurations outside standard scope (aisle containment, high-density racks, battery rooms), require performance-based assessment and, where needed, full-scale testing.
  • In acceptance testing, define detection time, suppression activation time and spread to adjacent equipment as measured acceptance criteria.
  • For facilities with battery energy storage, add NFPA 855 and UL 9540A references to the specification.
  • Validate any numerical (CFD) fire model against test data at a relevant scale.

Who should read it

Engineers designing data-centre fire detection and suppression systems and consultants planning acceptance and commissioning tests.

Document contents

  1. Fire safety challenges in data centres
  2. Standards for suppression systems
  3. Limits of standards compliance
  4. Performance-based fire safety engineering
  5. Experimental test scales and measurements

Publication details

Authors
Efectis
Publisher
Efectis
Year
2026
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Publisher public source inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

Efectis (2026). Experimental Assessment of the Fire Protection Systems Performance of Data Centers. Efectis. https://efectis.com/en/experimental-assessment-of-the-fire-protection-systems-performance-of-data-centers/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.