Water Reuse Case Study: Quincy, Washington
U.S. Environmental Protection Agency
An EPA and World Bank case study of the Quincy Water Reuse Utility, which treats a Microsoft data centre's cooling blowdown and returns it for cooling: operating since 2021, offsetting 138 million gallons/year, cost $31 million.
On this page
Overview
Quincy, in arid eastern Washington, receives only 7.8 inches (199 mm) of rain a year and draws all its potable water from five groundwater wells. The groundwater is rich in calcium, magnesium and silica; Microsoft's cooling towers cycled it four to five times and then sent the blowdown to the municipal wastewater reclamation facility. The high TDS (total dissolved solids) exceeded the facility's design, formed cake on the aquifer recharge basins in summer and pushed values above the Washington Department of Ecology groundwater guideline of 500 mg/L.
The solution was the Quincy Water Reuse Utility (QWRU), built jointly by the city and Microsoft. After more than 10 years of planning and construction it began operating on 30 June 2021, with 10 treatment systems and over 30 miles of pipe. After four to five cycles, blowdown passes through lime softening, ultrafiltration, high-efficiency softening and reverse osmosis; RO and ultrafiltration water are blended by conductivity (target 300-350 microsiemens) and returned to the data centre. Salts are concentrated in lined brine ponds and residuals disposed of every two to three years. An eight-hour permeate tank buffers maintenance downtime.
Make-up water for evaporation losses comes from untreated surface water, 260 million gallons per year (984 million litres) from the Columbia Basin Project irrigation canal, mostly in summer. About 5% of annual make-up is still potable groundwater, so reuse does not mean zero freshwater use. When canal pumps shut off in a hot, dry spell in 2021, the system switched to groundwater and kept running.
Financing rests on a 30-year agreement: the city owns and operates the facility, Microsoft finances the $31 million capital cost and all operating costs and pays a monthly treatment fee, and other companies can connect for connection fees. Benefits include 138 million gallons/year (522 million litres/year) of reduced groundwater demand, room for municipal growth, drought resilience through source diversity and support for Microsoft's 2030 water-positive goal. The reported savings belong to this specific system.
Key points
- Quincy gets 199 mm of rain a year; the city uses about 2.1 billion gallons of groundwater a year (57% food processing, 33% residential and commercial, 10% data-centre cooling).
- QWRU began operating on 30 June 2021 with 10 treatment systems and over 30 miles of pipe.
- Estimated groundwater demand offset is 138 million gallons (522 million litres) a year; total cost $31 million.
- Blowdown after four to five cycles goes through lime softening, ultrafiltration, high-efficiency softening and reverse osmosis; blend conductivity target is 300-350 microsiemens.
- Make-up water: 260 million gallons (984 million litres) a year from the Columbia Basin Project canal, mainly in summer.
- About 5% of annual make-up is still potable groundwater.
- Earlier blowdown TDS at the municipal plant exceeded the 500 mg/L groundwater guideline.
- 30-year agreement: city operates, Microsoft finances capital and operating costs; in the 2021 drought the system switched to groundwater to stay in service.
- Brine pond residuals are disposed of every two to three years; about 10 years of planning and construction were needed.
Using it in design
- With high-TDS source water, plan tower cycles and blowdown treatment (softening, ultrafiltration, reverse osmosis) holistically from the start.
- If closed-loop blowdown recovery is installed, include brine concentration and disposal (lined ponds, solid residuals every two to three years) in the project.
- Since cooling needs no potable water, plan make-up from alternatives such as irrigation canal or surface water, with mains or groundwater as backup.
- Size buffer volumes such as the permeate tank for treatment downtime and install conductivity-based blend control.
- Define capital, operating cost, tariff adjustment and new-customer connection terms in the contract between city and operator.
Who should read it
Engineers planning data-centre cooling water recovery, water utilities and managers structuring public-private agreements.
Document contents
- Overview
- Context
- Solution
- Treatment System Description
- Make-up Water Sources
- Policy, Institutional, and Regulatory Environment
- Financial and Contractual Agreements
- Benefits
- Lessons Learned and Conclusions
Publication details
- Authors
- U.S. Environmental Protection Agency
- Publisher
- U.S. Environmental Protection Agency
- Year
- 2023
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Publisher public source inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.
Citation
U.S. Environmental Protection Agency (2023). Water Reuse Case Study: Quincy, Washington. U.S. Environmental Protection Agency. https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.