A Xylem case study describes two 120-inch Vantage PTI multimedia filtration trains at a Virginia hyperscale campus treating 1,200 gpm of makeup and 200 gpm of blowdown with redundancy.
On this page
Overview
The document is a two-page Xylem case study from June 2026. The customer is a retailer operating its own hyperscale data center. The project needed downtime-preventing water treatment for a new Virginia campus cooling system, with strict discharge limits.
The campus treats two distinct water streams. The first is reservoir intake water used as cooling tower makeup, where suspended solids and iron can drive scaling, corrosion and lower heat transfer. The second is non-contact cooling tower blowdown, filtered after pH adjustment and coagulation/flocculation before discharge to a nearby creek.
The solution was two Vantage Pre-Treatment Industrial (PTI) series multimedia filtration systems, each built around 120-inch-diameter vessels with stainless steel face piping and fully automated air scour. Redundancy comes from parallel filtration capacity and backup pumps, so cooling continues during maintenance or equipment downtime.
After the order, a design change involving exchange tanks arrived and the schedule was re-baselined without losing the delivery date. The document is a manufacturer case and reports design targets, not operating data.
Key points
- Makeup treatment train designed for up to 1,200 gpm.
- Makeup targets: TSS below 20 ppm and dissolved iron below 1 ppm.
- Blowdown treatment stream designed for 200 gpm.
- Blowdown metals targets: soluble copper below 0.03 ppm and soluble zinc about 0.00 ppm.
- Two systems with 120-inch vessels and stainless steel face piping.
- Automated air scour and backwash reduce cycle time and water use.
- Backup pumps and parallel filtration keep cooling online during maintenance.
- Better water quality supports higher cycles of concentration at the tower.
Using it in design
- Write TSS and iron targets for tower makeup into the specification and size pretreatment against them.
- Design N+1 or parallel filter capacity with backup pumps, and verify that one train in maintenance still meets full makeup flow.
- Set metals limits for the blowdown discharge permit early and select the treatment train to meet them.
- Account for backwash water and sludge handling as a separate item in the water budget.
- Consider pre-assembled, factory-tested packages to shorten site time on accelerated schedules.
Who should read it
Mechanical and water engineers designing makeup and blowdown treatment for water-cooled data centres.
Document contents
- Challenge
- Solution
- Results
Publication details
- Authors
- Xylem
- Publisher
- Xylem
- Year
- 2026
- Document number
- DC-REDUNDANT-COOLING-CS-0626
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official public manufacturer source inspected. No redistribution permission established. Metadata and original brief summaries only; local files are research evidence, not a redistribution package.
Citation
Xylem (2026). No margin for downtime: Redundant cooling water treatment for a hyperscale data center. Xylem. DC-REDUNDANT-COOLING-CS-0626. https://amp.xylem.com/asset/c56b270e-bd46-46c7-803f-937ffd685e4c/No-margin-for-downtime-redundant-cooling-water-treatment-for-a-hyperscale-data-center.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.