RegulationFree to read2026

Regulation Amending the Electricity Market Ancillary Services Regulation (19 October 2026)

Original title Elektrik Piyasası Yan Hizmetler Yönetmeliğinde Değişiklik Yapılmasına Dair Yönetmelik: 19 Ekim 2026

Enerji Piyasası Düzenleme Kurumu

EPDK amending regulation of 19.10.2026 (Official Gazette 33405): a new document for distribution-connected sites in demand-side participation, 10% and 25% monitoring thresholds, capacity fee reduction and a transitional date moved to 31.12.2026.

On this page

Overview

The regulation amends the Electricity Market Ancillary Services Regulation (Official Gazette 30252, 26.11.2017) in seven articles. The changes cover aggregators' application documents, payment calculation and monitoring results in the demand-side participation service. The text is not an implementation guide on its own and has to be read together with the parent regulation.

Article 1 adds a document requirement to Article 31/C: for consumption facilities connected to the distribution system, a document containing meter information and contracted power, approved by the relevant distribution licensee. Article 2 defines the payment to aggregators as the monthly capacity fee plus the activation fee, and brings the number of instructed hours and 'non-participation' hours in the critical month into the calculation.

Article 3 sets the monitoring outcomes. If less load is shed than instructed, a shortfall up to 10% of the instructed amount counts as 'delivered', 10% to 25% as 'not delivered', and 25% or more as 'did not participate'. If more load is shed, an excess up to 50% of the instruction is 'delivered' and above that 'not delivered'. Where the transmission system operator approved it at least 1 hour before the instruction, shedding more than 50% of the instructed amount also counts as 'delivered'.

Article 4 removes a phrase on capacity-fee payment in 31/G and ties the reduction to the ratio of 'did not participate' hours to total instructed hours in the critical month. Article 5 changes the date in transitional Article 12 from 1/9/2026 to 31/12/2026. The regulation enters into force on publication.

Key points

  1. Published in the Official Gazette on 19.10.2026, number 33405; in force on publication.
  2. Distribution-connected consumption facilities need a document with meter information and contracted power, approved by the distribution licensee (31/C, new sub-item 14).
  3. Aggregator payment is the monthly capacity fee plus, where an activation instruction is fulfilled, the activation fee.
  4. Under-delivery: shortfall up to 10% of the instruction is 'delivered', 10-25% 'not delivered', 25% or more 'did not participate'.
  5. Over-delivery: excess up to 50% of the instruction is 'delivered', above 50% 'not delivered'.
  6. With TEIAS approval at least 1 hour before the instruction, shedding more than 50% of the instructed amount counts as 'delivered'.
  7. The capacity fee reduction equals the ratio of 'did not participate' hours to instructed hours in the critical month.
  8. The date in transitional Article 12 moves from 1 September 2026 to 31 December 2026.

Using it in design

  • For data-centre projects considering demand-side participation, plan the distribution-company-approved meter and contracted-power document as an early item in the application file.
  • When sizing flexible load, aim for a load-shed accuracy that can stay inside the 10% and 25% thresholds against the instructed amount.
  • If a generator or battery is used to shed load, confirm in the parent regulation which measurement point the monitoring result is evaluated at.
  • Base the participation decision on the current consolidated parent regulation and the aggregator contract, not on this amending text.
  • Put the transitional Article 12 date of 31.12.2026 into the project calendar.

Who should read it

Data-centre operators, energy managers and regulatory advisers interested in demand-side participation and aggregation.

Document contents

  1. Article 1: amendment to 31/C (document for distribution-connected facilities)
  2. Article 2: amendment to 31/E (demand-side participation payment)
  3. Article 3: amendment to 31/F (monitoring results)
  4. Article 4: amendment to 31/G
  5. Article 5: transitional Article 12 date
  6. Articles 6-7: entry into force and execution

Publication details

Authors
Enerji Piyasası Düzenleme Kurumu
Publisher
Enerji Piyasası Düzenleme Kurumu
Year
2026
Document number
RG 19.10.2026 / 33405
Document language
Turkish
Source type
Turkish regulation
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Public publisher source inspected. Free reading is not commercial redistribution permission; metadata and original short summaries only.

Citation

Enerji Piyasası Düzenleme Kurumu (2026). Elektrik Piyasası Yan Hizmetler Yönetmeliğinde Değişiklik Yapılmasına Dair Yönetmelik: 19 Ekim 2026. Enerji Piyasası Düzenleme Kurumu. RG 19.10.2026 / 33405. https://epdk.gov.tr/Detay/DownloadDocument?id=yyDQaLCPgGU=

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.