LEAP: Large Energy User Action Plan

Original title LEAP – Large Energy User Action Plan

Department of Enterprise, Tourism and Employment, Ireland

Irish government plan of 13 January 2026: 17 actions to co-locate very energy-intensive users with renewable generation in green energy parks after 2030, with very limited opportunities in Dublin.

On this page

Overview

Prepared jointly by the Department of Enterprise, Tourism and Employment and the Department of Climate, Energy and the Environment, the Large Energy User Action Plan (LEAP) sets a plan-led approach to locating very energy-intensive sectors such as semiconductors, AI, data centres, life sciences and chemicals. It targets the period beyond 2030, identifying strategic green energy parks expected to be hundreds of megawatts in scale and co-locating these sectors with indigenous renewable supply. The plan contains 17 actions.

The actions include cross-government collaboration, a National Planning Statement for Green Energy Parks, proactive consultation with system operators and industry, more demand-side flexibility through innovative grid connection contracts, modelling of LEU development scenarios and development of IDA Next Generation Sites. The plan does not preclude development outside strategic locations, but expects very large projects to be best served in nationally planned sites.

On data centre policy, the plan carries forward the principles of the 2022 Government Data Centre Statement: strong economic activity, efficient use of renewable energy, efficient use of grid infrastructure and potential to co-locate renewable generation or storage. The CRU's December 2025 revised LEU Connection Policy sets criteria for connecting new data centres and requires additional dispatchable generation, some of which could come from indigenous biogas. Islanded data centres are seen as not in line with national policy objectives.

The plan notes that data-centre electricity demand reached 22% of national metered consumption in 2024 and has grown faster than grid infrastructure, so available grid capacity will constrain data-centre growth in the short and medium term. It stresses that opportunities in Dublin, especially for retail and colocation facilities, will be extremely limited by existing capacity constraints, with demand-side flexibility examined to release capacity. Fault ride through is named as a technical issue to resolve.

Key points

  1. Published 13 January 2026; the plan has 17 actions and focuses on the period after 2030.
  2. Aim: co-locate very energy-intensive sectors (data centres, semiconductors, life sciences, chemicals) with renewable supply in green energy parks, sites of hundreds of MW.
  3. A National Planning Statement for Green Energy Parks will be prepared; IDA Next Generation Sites will be developed.
  4. LEU demand flexibility will be encouraged through innovative grid connection contracts.
  5. Data centre principles: economic activity, efficient use of renewables, efficient use of grid capacity, co-location with renewable generation or storage (CPPA, private wire and similar).
  6. The CRU's December 2025 LEU Connection Policy requires additional dispatchable generation, some of which could be indigenous biogas.
  7. Islanded data centres are not in line with national policy objectives.
  8. Data centres used 22% of national metered electricity in 2024; grid capacity will constrain growth in the short and medium term.
  9. In Dublin, limited opportunities will be explored with system operators and through demand flexibility, but are expected to be extremely limited.
  10. Fault ride through is named as a technical challenge for system operators and industry to resolve together.

Using it in design

  • For a new Irish data centre, assess regional sites that can be co-located with renewable generation against the green energy park approach.
  • In the connection application, build the dispatchable generation capacity (generator, storage or biogas) required by CRU policy and its operating mode into the design from the start.
  • For flexible or non-firm connection contracts, define the curtailable share of load and the method of transferring to backup power.
  • For Dublin colocation projects, weigh the wait for grid capacity together with a demand flexibility option.
  • Include fault ride through capability in UPS and power electronics selection against grid connection requirements.
  • Record in the project risk analysis that islanded operating strategies conflict with policy.

Who should read it

Investors planning siting and connection strategy for data centres and other very energy-intensive facilities in Ireland, and policy and electrical advisers.

Document contents

  1. Ministerial foreword
  2. Executive summary
  3. Planning for energy intensive sectors of the future
  4. LEAP strategy and actions (energy infrastructure delivery, regulatory certainty, enhanced planning coordination, new routes to co-location, preparing for strategic opportunities)
  5. Implementation and timeline
  6. Unlocking additional renewable energy opportunities
  7. Data centre policy
  8. What are the opportunities of a plan-led approach?

Publication details

Authors
Department of Enterprise, Tourism and Employment, Ireland
Publisher
Department of Enterprise, Tourism and Employment, Ireland
Year
2026
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

Department of Enterprise, Tourism and Employment, Ireland (2026). LEAP – Large Energy User Action Plan. Department of Enterprise, Tourism and Employment, Ireland. https://enterprise.gov.ie/en/publications/leap.html

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.