Technical guideFree to read2024

Singapore Green Data Centre Roadmap

Original title Green Data Centre Roadmap (Singapore)

Infocomm Media Development Authority (IMDA), Singapore · Infocomm Media Development Authority (IMDA)

Singapore IMDA's 2024 roadmap sets a 10-year goal for all data centres to reach PUE ≤ 1.3 at 100% IT load and WUE ≤ 2.0 m3/MWh, alongside at least 300 MW of additional capacity.

On this page

Overview

The roadmap begins by noting that Singapore is a regional data-centre hub with total capacity above 1.4 GW, while data centres are heavy users of power and water. The digital economy is about 17.3% of GDP, and the data-centre sector accounts for 82% of the domestic information and communications sector's greenhouse gas emissions. The government aims to provide at least 300 MW of additional capacity in the near term, and much more through green-energy deployments.

Energy efficiency is addressed at two levels. At facility level, current designs can reach PUE ≤ 1.3 at 100% IT load, and all Singapore data centres are to reach this within 10 years. The roadmap lists mechanical and electrical equipment upgrades (a simulated 50% reduction in supporting-infrastructure energy), the Tropical Data Centre method (2-5% cooling energy savings per 1 °C rise in operating temperature), cooling matched to density, hybrid air and liquid cooling, and sensor and digital-twin optimisation.

At IT-equipment level the goal is that only energy-efficient IT infrastructure is used: Energy Star or EU Ecodesign compliant hardware, encouragement through contracts at server refresh cycles (three to seven years), power-management settings, virtualisation and workload consolidation, and carbon-efficient software design. On the green-energy side, recognised sources include bioenergy, fuel cells with carbon capture, low-carbon hydrogen and ammonia, and building-integrated photovoltaics.

The document also sets a water-efficiency goal: in 2021 the median WUE of large water users (net consumption of at least 60,000 m3 a year) was 2.2 m3/MWh, and the target is 2.0 m3/MWh or lower within 10 years. The roadmap is a policy document, not a binding technical specification; it frames targets, incentives (REG(E), IA(ER), an Energy Efficiency Grant), research programmes and later standard updates (GMDC by end-2024, IT equipment and liquid cooling standards by 2025).

Key points

  1. Singapore's total data-centre capacity exceeds 1.4 GW; the digital economy is about 17.3% of GDP.
  2. The data-centre sector accounts for 82% of greenhouse gas emissions of the domestic information and communications sector.
  3. Targets: at least 300 MW additional capacity in the near term; PUE ≤ 1.3 at 100% IT load for all data centres within 10 years.
  4. At PUE 1.3, mechanical and electrical infrastructure uses about 24% of total energy; at PUE 1.5-2.0 it uses 33-50%.
  5. Upgrading mechanical and electrical equipment (chillers, UPS, CRAH) was shown by simulation to cut supporting infrastructure energy by 50%.
  6. Tropical Data Centre method: 2-5% cooling energy savings for every 1 °C rise in operating temperature.
  7. Average rack density rose from 2.4 kW/rack in 2011 to 8.4 kW/rack in 2020; AI racks can need 20 kW to over 100 kW; air cooling supports racks up to 20 kW.
  8. An ASME study found liquid cooling cuts total data-centre energy by 10% versus full air cooling above 20 kW per rack; a single-phase immersion example reports partial PUE below 1.02.
  9. Water: median WUE of large users was 2.2 m3/MWh in 2021; target ≤ 2.0 m3/MWh in 10 years; cooling towers account for up to 97% of water use.
  10. Centres using at least 60,000 m3 a year must install private water meters and submit a Water Efficiency Plan.

Using it in design

  • Take PUE ≤ 1.3 at 100% IT load as a design criterion for new facilities and calculate part-load PUE separately.
  • In tropical and hot climates, design the operating-temperature increase strategy with a stepwise checklist; 2-5% cooling saving per 1 °C is a reference value to be verified on site.
  • Create cooling zones by rack density: air up to 20 kW, rear-door heat exchangers, direct-to-chip or immersion above; arrange the hall to run in hybrid mode.
  • For sites with cooling towers, support the WUE target (≤ 2.0 m3/MWh) with blowdown recycling and higher cycles of concentration, and add private water meters.
  • Provide in the design the data infrastructure for sensor and digital-twin optimisation of chiller and CRAH setpoints.
  • Consider requiring Energy Star or Ecodesign compliance in server-refresh and tenant contracts.

Who should read it

Engineers designing data centres in Singapore or tropical climates, operators applying for capacity allocation, and analysts benchmarking national policies.

Document contents

  1. Executive Summary
  2. Transformative Potential of Digital
  3. Pioneering the Sustainable Growth of Data Centres
  4. Accelerate Energy Efficiency (facility level, compute/IT equipment level, working together)
  5. Green Energy for Growth
  6. Driving Further Innovation
  7. Anchor Best-in-Class DCs
  8. Water Efficiency
  9. Conclusion

Related standards

  • SS 564
  • SS 697 (Tropical DC)
  • Green Mark for Data Centres (GMDC)
  • ISO/IEC 30134-9

Publication details

Authors
Infocomm Media Development Authority (IMDA)
Publisher
Infocomm Media Development Authority (IMDA), Singapore
Year
2024
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Booklet states (c) IMDA 2024, all rights reserved.

Citation

Infocomm Media Development Authority (IMDA) (2024). Green Data Centre Roadmap (Singapore). Infocomm Media Development Authority (IMDA), Singapore. https://www.imda.gov.sg/assets/c99c4fa7-8fe9-4082-9969-1e86f69375e4.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.