Johnson Controls guide 407 describes a 1 GW AI campus using CHP generators and absorption chillers that cut cooling electrical load by about 44%, targeting PUE 1.23 and WUE 0.

On this page

Overview

The guide is number 407 in the Johnson Controls AI Factory reference design series, developed with Lynk Engineers (Version 1.0, 2026). It covers a 1 gigawatt campus that replaces electric chillers with hot-water driven absorption chillers fed by waste heat from combined heat and power (CHP) generators, plus direct gas-fired absorption chillers. It gives recommended design temperatures and operating conditions for each stage of the chip-to-ambient thermal chain.

The campus has 8 compute clusters of 110 MW each and one 120 MW networking core. Each cluster is 90% liquid cooled and 10% air cooled. Technology cooling system (TCS) supply is 30 °C, CRAH air supply 27 °C, and the combined facility loop 18.3 °C supply and 25 °C return. Design ambient is 40 °C and maximum operating ambient 55 °C, where chilled water supply rises above design values.

The equipment list per cluster is 72 reciprocating gas engines (CHP), 72 hot-water driven and 12 direct gas-fired absorption chillers, 264 CDUs and 196 CRAHs, including redundant units. Generators and absorption chillers are paired 1:1, and pumps, heat exchangers, chillers and dry coolers are engineered as one module.

Results are stated against an electric chiller baseline: about 44% lower cooling electrical load, and either +97 MW of IT load on the same fuel or 8,746 therms/hr less fuel. The figures are vendor design targets given for a Southwest US location and need to be recalculated for the actual site.

Key points

  1. Campus: 8 × 110 MW compute clusters and 1 × 120 MW networking core; clusters 90% liquid and 10% air cooled.
  2. About 44% reduction in cooling electrical load; freed power supports +97 MW of additional IT capacity.
  3. Chiller plant power falls from 27% of IT load (electric) to 15%; peak CO2 emissions drop 43% (46.3 metric tons/hour).
  4. PUE comparison: electric chiller + dry cooler 1.35 (WUE 0); electric chiller + adiabatic cooler 1.27 (WUE 3.4); absorption chiller + dry cooler 1.23 (WUE 0).
  5. Absorption cooling uses about 0.04 kW electricity per ton; water is the refrigerant and lithium bromide solution drives the cycle.
  6. On-site generation loses about 57% of energy as waste heat; absorption chillers reuse 80% of it for cooling.
  7. CUE falls from 0.108 to 0.061.
  8. Per cluster: 72 gas engines, 72 hot-water driven and 12 direct gas-fired chillers, 264 CDUs, 196 CRAHs.
  9. TCS 30 °C supply; combined facility loop 18.3 °C supply, 25 °C return; design ambient 40 °C.

Using it in design

  • Match the quantity and temperature of CHP waste heat on site to the hot-water driven chiller inlet, and define the redundancy scheme for 1:1 generator-chiller pairs separately.
  • Verify chilled water temperatures (18.3 °C supply, 25 °C return) against high-temperature liquid cooling and the 27 °C CRAH air supply.
  • Add the rise in chilled water supply temperature above the 40 °C design ambient (up to 55 °C in the guide) to the thermal scenario analysis.
  • On water-restricted sites, weigh dry coolers with absorption chillers for WUE 0 against the larger dry cooler area and gas fuel supply.
  • Treat gas infrastructure, emission permits and fuel supply reliability as preconditions for grid-independent operation.

Who should read it

Planners and mechanical designers evaluating cooling architectures built on on-site power and waste heat reuse for gigawatt-scale AI campuses.

Document contents

  1. Overview
  2. Intended goals and industry challenges
  3. Gigawatt AI Factory blueprint
  4. Selected equipment list
  5. Absorption chillers with on-site power generation
  6. Energy and water efficiency (PUE and WUE)
  7. Carbon footprint
  8. Higher compute efficiency through heat reuse
  9. Absorption cooling at work

Publication details

Authors
Johnson Controls
Publisher
Johnson Controls
Year
2026
Document number
Guide 407 Version 1.0
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

PDF footer explicitly states copyright 2026 Johnson Controls, all rights reserved. Linked from the official reference-design index; no form submission.

Citation

Johnson Controls (2026). 1 Gigawatt AI Factory Blueprint: Thermally driven absorption chillers with on-site power generation (407). Johnson Controls. Guide 407 Version 1.0. https://tyco.widen.net/content/ehwldgn5z3/original/jc_ai_factory_absorption_rdg_407_v1.pdf?u=0eetov&download=true

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.