The Korean K-Taxonomy commentary recognises low-carbon data centres by green data-centre certification, or by building certification plus PUE below 1.4 (new) or 1.5 (existing).

On this page

Overview

This section of the Korean Green Taxonomy (K-Taxonomy) economic activity commentary, under the cities and buildings heading, explains the recognition criteria for construction and operation of low-carbon data centres to count toward the greenhouse gas reduction objective. It is structured in four headings: activity, recognition, exclusion and protection criteria. Meeting one or more of the recognition criteria is sufficient.

Recognition criterion A asks for Green Data Center Certification at Platinum for new data centres and at least Gold for existing ones. The certification is a private scheme specific to data centres, based on energy efficiency criteria. At financing stage, a design-based preliminary certificate or design certificate allows the criterion to be pre-checked.

Recognition criterion B combines building certification with measured PUE. At least one building certificate is required: Zero Energy Building (ZEB) certification (grade 3 or higher for public buildings, grade 5 or higher for others), the top G-SEED green building grade, or LEED Platinum. In addition, PUE must be below 1.4 for new and below 1.5 for existing data centres, calculated with the measurement boundary and period of ISO/IEC 30134-2. The text also includes a table comparing the ZEB, G-SEED and LEED schemes. These are taxonomy criteria, not a universal operating permit; they determine green finance eligibility in Korea.

Key points

  1. There are two alternative recognition routes for a low-carbon data centre; meeting one satisfies the criterion.
  2. Route A: Green Data Center Certification Platinum for new facilities and at least Gold for existing ones.
  3. Route B: an eligible building certificate plus PUE below 1.4 for new or below 1.5 for existing data centres.
  4. Accepted building certificates: ZEB (grade 3+ for public buildings, grade 5+ for others), top-grade G-SEED, LEED Platinum.
  5. PUE must be calculated with the measurement boundary and period of ISO/IEC 30134-2.
  6. At financing stage, a design-based preliminary certificate or design certificate can pre-check the criterion.
  7. In Korea, ZEB requires design at grade 4 for public buildings over 1,000 m2 from 2025 and at grade 5 level for private buildings.
  8. G-SEED is mandatory for public buildings of 3,000 m2 and above.

Using it in design

  • For Korean green finance, decide early which route (A or B) the project follows and add the certification plan to the design programme.
  • For Route B, design PUE below 1.4 for a new facility and below 1.5 for an existing one, and define the measurement boundary per ISO/IEC 30134-2.
  • Select the building certification (ZEB, G-SEED or LEED) and its grade at concept design, and obtain a preliminary or design certificate for financing.
  • Use the taxonomy criteria as a finance-eligibility checklist, not as an operating permit.

Who should read it

Data-centre investors seeking green finance or taxonomy eligibility in Korea, certification consultants and designers.

Document contents

  1. Overview
  2. Activity criteria
  3. Recognition criteria (A: Green Data Center Certification; B: green building certification and PUE)
  4. Exclusion criteria
  5. Protection criteria
  6. Key terms (ZEB, G-SEED, LEED)

Publication details

Authors
Korean Green Management Information Portal (GMI)
Publisher
Korean Green Management Information Portal (GMI)
Year
Year not stated
Document language
Korean
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

Korean Green Management Information Portal (GMI) K-Taxonomy commentary: construction and operation of low-carbon data centres. Korean Green Management Information Portal (GMI). https://gmi.go.kr/html/cmmntry/03/0302/030204/03020405/commentary0302040502.html

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.