Technical guideFree to read2026

Data Centre Evaluation Framework to Help States Plan for Sustainable Growth (NITI Aayog)

Original title Data Centre Evaluation Framework to Help States Plan for Sustainable Growth

NITI Aayog, Frontier Tech Hub

NITI Frontier Tech Hub's October 2026 working paper: common criteria and minimum approval documents for Indian states to evaluate data centre proposals across five pillars (power, water, siting and environment, economic value, governance).

On this page

Overview

The document is a working paper dated 14 October 2026, prepared by NITI Aayog's NITI Frontier Tech Hub (FTH) in consultation with experts and stakeholders (data are from secondary sources). It gives states that want to weigh the electricity, water, land and supporting infrastructure needs of India's growing data centre sector against economic benefits a common set of parameters. The framework is decision support, not a mandatory uniform approach or an extra layer of regulation.

The framework rests on four principles: plan before approval (assess the full campus at node and corridor level and treat large data centres as grid-interactive loads capable of demand response); protect local systems (test basin stress, existing users, climate, backup sources and lifecycle liabilities before construction); secure public value; and enforce delivery (separate central and state roles). The five pillars are power and energy, water, siting and environmental sustainability, economic and strategic value, and policy, governance and implementation.

The power pillar is the most detailed: the developer, distribution company (DISCOM) and transmission utility (STU) jointly validate a Power Readiness and Ramp-up Plan covering total campus demand, sanctioned MW, year-wise energisation and substation and transmission augmentation; load-flow studies cover 33 kV/11 kV feeder limits, voltage sag, power factor and N-1/N-2 cases; the facility is classified as conventional colocation, AI/HPC/GPU compute or hybrid; facilities above 20 MW need automated demand-response readiness and SLDC telemetry; and modelled design PUE and guaranteed operating PUE are required, with operating PUE and CUE reported.

The water pillar asks for a 20-30 year seasonal catchment water balance, fit-for-use water quality and quantity, source-wise WUE, protection of existing users and treated or desalinated water where basins are stressed; cooling technologies (air-cooled, indirect evaporative, liquid, closed-loop, immersion) are compared against climate, rack density, PUE and WUE. The siting pillar covers land title, zoning, expansion headroom and access to multiple fibre providers. The economic pillar asks for net economic contribution, domestic procurement share and incentives linked to measurable outcomes.

Key points

  1. Five pillars: power and energy, water, siting and environmental sustainability, economic and strategic value, policy governance and implementation.
  2. A power readiness plan is jointly validated by developer, DISCOM and STU, with total campus demand, sanctioned MW and year-wise energisation.
  3. Load-flow studies cover 33 kV/11 kV feeder limits, voltage sag, power factor and N-1/N-2 at 132/220/400 kV substations.
  4. Facilities above 20 MW need automated demand-response readiness and SLDC telemetry and control integration.
  5. Design PUE and guaranteed operating PUE are required; operating PUE, CUE and site-level GHG emissions are reported.
  6. Water: 20-30 year seasonal catchment water balance, source-wise WUE; desalinated water where basins are stressed; no added strain on existing freshwater.
  7. Cooling options (air-cooled, indirect evaporative, liquid, closed-loop, immersion) are compared against climate, rack density, PUE and WUE.
  8. Incentives should be linked to measurable outcomes such as domestic procurement, skills, innovation and sustainable resource use.

Using it in design

  • Take the power readiness plan as the design basis: align sanctioned MW, the year-wise energisation schedule and substation augmentation dates with the phasing plan.
  • Classify the facility as conventional colocation, AI/HPC/GPU or hybrid and document power and cooling density against that class.
  • Report the design PUE target and guaranteed operating PUE; compare cooling options together with WUE for the local climate.
  • For facilities above 20 MW include demand-response and SLDC telemetry integration in the control system architecture.
  • Contract water source by source (municipal, treated wastewater, grey water) and write a fit-for-use quality specification; where basins are stressed add a desalination option to the feasibility study.

Who should read it

State agencies evaluating data centre proposals in India, and developers, grid and water consultants preparing projects.

Document contents

  1. Purpose
  2. What Does the Framework Assess
  3. How Can States Use the Framework
  4. International Experience
  5. Four Principles
  6. Pillar 1: Power and Energy
  7. Pillar 2: Water
  8. Pillar 3: Siting and Environmental Sustainability
  9. Pillar 4: Economic and Strategic Value
  10. Pillar 5: Policy, Governance and Implementation

Publication details

Authors
NITI Aayog, Frontier Tech Hub
Publisher
NITI Aayog, Frontier Tech Hub
Year
2026
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Publisher public source inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

NITI Aayog, Frontier Tech Hub (2026). Data Centre Evaluation Framework to Help States Plan for Sustainable Growth. NITI Aayog, Frontier Tech Hub. https://www.niti.gov.in/node/2443

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.