Technical guideFree to readYear not stated

Data centre physical perimeter and building risks for owners

UK National Protective Security Authority · NPSA

UK National Protective Security Authority guidance for data-centre owners that connects perimeter controls with ducts, cable pits, meet-me rooms and building-management systems.

On this page

Overview

The guidance addresses physical-security topics specific to data centres, written for owners. Rather than leaving perimeter controls to a generic building-security approach, it treats cable access chambers and meet-me rooms at the data-centre boundary as part of the security assessment.

The building-management system (BMS) section asks operators to consider client-network connections, access assurances and cyber-vulnerability assessment. This brings the physical perimeter and the cyber side of building automation into one risk assessment.

Key points

  1. Cable access chambers are treated as boundary points that need a security assessment.
  2. Meet-me rooms are assessed separately for security.
  3. Ducts and cable pits are part of the perimeter-security discussion.
  4. The BMS section asks for client-network connections to be considered.
  5. Access assurances and a cyber-vulnerability assessment are expected for the BMS.

Using it in design

  • Mark cable access chambers, ducts and cable pits on the site-boundary plan as security points and define their access control.
  • Plan the meet-me room as a separate security zone.
  • Inventory connections between the BMS and client networks and run the cyber-vulnerability assessment before commissioning.
  • Combine physical barriers and building-automation security in one risk assessment in the perimeter design.

Who should read it

Data-centre owners, security consultants and engineers designing perimeter and building security.

Publication details

Authors
NPSA
Publisher
UK National Protective Security Authority
Year
Year not stated
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official HTML article inspected. Publication year unknown. Linked owners/users PDF requests returned 403/target_unreachable; they were not treated as read full-text sources.

Citation

NPSA Data centre physical perimeter and building risks for owners. UK National Protective Security Authority. https://www.npsa.gov.uk/data-centre-physical-perimeter-and-building-risks-owners

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.