Data centre physical perimeter and building risks for owners
UK National Protective Security Authority · NPSA
UK National Protective Security Authority guidance for data-centre owners that connects perimeter controls with ducts, cable pits, meet-me rooms and building-management systems.
On this page
Overview
The guidance addresses physical-security topics specific to data centres, written for owners. Rather than leaving perimeter controls to a generic building-security approach, it treats cable access chambers and meet-me rooms at the data-centre boundary as part of the security assessment.
The building-management system (BMS) section asks operators to consider client-network connections, access assurances and cyber-vulnerability assessment. This brings the physical perimeter and the cyber side of building automation into one risk assessment.
Key points
- Cable access chambers are treated as boundary points that need a security assessment.
- Meet-me rooms are assessed separately for security.
- Ducts and cable pits are part of the perimeter-security discussion.
- The BMS section asks for client-network connections to be considered.
- Access assurances and a cyber-vulnerability assessment are expected for the BMS.
Using it in design
- Mark cable access chambers, ducts and cable pits on the site-boundary plan as security points and define their access control.
- Plan the meet-me room as a separate security zone.
- Inventory connections between the BMS and client networks and run the cyber-vulnerability assessment before commissioning.
- Combine physical barriers and building-automation security in one risk assessment in the perimeter design.
Who should read it
Data-centre owners, security consultants and engineers designing perimeter and building security.
Publication details
- Authors
- NPSA
- Publisher
- UK National Protective Security Authority
- Year
- Year not stated
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official HTML article inspected. Publication year unknown. Linked owners/users PDF requests returned 403/target_unreachable; they were not treated as read full-text sources.
Citation
NPSA Data centre physical perimeter and building risks for owners. UK National Protective Security Authority. https://www.npsa.gov.uk/data-centre-physical-perimeter-and-building-risks-owners