ACS Door Heat Exchanger Requirements for Open Rack, Revision 1.0
Open Compute Project Foundation
The OCP Advanced Cooling Solutions document defining mechanical, electrical, air-side and water-side requirements and test methods for active and passive rear-door heat exchangers on Open Rack.
On this page
Overview
This is a requirements document from the Open Compute Project's Advanced Cooling Solutions group (authors from Facebook and nVent) covering active and passive rear-door heat exchangers on Open Rack. It defines mechanical integration with ORV3, the electrical and communication interfaces of active doors, facility air- and water-side operating conditions, and the performance parameters a vendor must declare. Test methods are also in scope: pressure and leak tests, and air-sealing tests. Leak tightness is verified by gas pressure-decay or helium testing, with 'water tight' defined as a leak rate of 1e-2 mbar.l/s. For water quality the document points to ASHRAE liquid-cooling guidelines (Table 5.3 for the FWS loop, Table 6.2 for the TCS loop) with VDI 2035 Part 2 as further guidance.
On the water side, the recommended minimum coolant supply temperature to a door HX is 16 C to avoid excessive condensation (within ASHRAE W1); this is a floor, not a fixed setpoint. The coolant temperature difference across the door HX should be maximised for facility efficiency unless the site defines it (an example of at least 8 C is given). As general guidance a floor-level CDU may operate in a 140-450 kPa range, while a direct facility-water connection may impose higher pressures in multi-storey buildings.
Electrically, active doors take 230 VAC via C14/C20 inlets (or DC from the Open Rack busbar, in which case the PSU/BBU shelves and busbar must account for the load) and should support Modbus RTU/IP, SNMP v2/3 or HTTP. On the air side, OCP Ready gear should meet ASHRAE Class A1 allowable conditions.
Key points
- Recommended minimum coolant supply temperature to a door HX is 16 C (within ASHRAE W1); a floor, not a fixed setpoint.
- Coolant temperature difference across the door HX should be maximised unless the site defines it (example: at least 8 C).
- A floor-level CDU may operate in a 140-450 kPa range; direct facility-water connection may impose higher pressures in multi-storey buildings.
- Water quality: ASHRAE Table 5.3 (FWS loop) or Table 6.2 (TCS loop), with VDI 2035 Part 2 as further guidance.
- Active doors take 230 VAC via C14/C20 (or DC from the busbar) and should support Modbus RTU/IP, SNMP v2/3 or HTTP.
- OCP Ready gear should meet ASHRAE Class A1 allowable conditions on the air side.
- Leak tightness is verified by gas pressure-decay/helium testing; 'water tight' is 1e-2 mbar.l/s.
Using it in design
- For rear-door HX selection, record rated kW, fan power, coolant inlet temperature, flow, pressure drop and active/passive type.
- Raise a condensation warning when door-HX supply temperature is set below 16 C or below the room dew point.
- For DC-fed active doors, add the fan load to the rack busbar and PSU budget.
- Compare facility liquid-loop pressure with the rear-door heat exchanger’s pressure rating in multi-storey buildings.
- Set water quality per the ASHRAE and VDI 2035 Part 2 guidance.
Who should read it
Cooling engineers selecting rear-door heat exchangers and designing liquid loops for Open Rack environments, and equipment vendors.
Related standards
- ASHRAE Liquid Cooling Guidelines for Datacom Equipment Centers
- VDI 2035 Part 2
- OCP Open Rack V3 Base Specification
Publication details
- Authors
- Open Compute Project Foundation
- Publisher
- Open Compute Project Foundation
- Year
- 2021
- Document number
- Rev 1.0
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Bibliographic reference only: the document is not redistributed here; confirm reuse terms at the original source
Original licence note
PDF states copyright Facebook Inc. and Schroff Inc. 2021, all rights reserved; no Creative Commons/OWFa statement found.
Citation
Open Compute Project Foundation (2021). ACS Door Heat Exchanger Requirements for Open Rack, Revision 1.0. Open Compute Project Foundation. Rev 1.0. https://www.opencompute.org/documents/acs-door-hx-open-compute-requirements-for-open-rack-rev1-0-1-pdf/