Technical guidePDF2024

Seizing Data Center Heat Reuse Opportunities: Guidelines for Local Authorities, V1.00 (OCP Heat Reuse)

Open Compute Project Foundation · David Gardiner (DG&A), Otto Van Geet (NREL) et al.

A short two-page OCP guide written for municipal planners on enabling data-centre heat reuse. It summarises offtake uses, barriers and the steps local authorities can take, and is useful for planning-stage heat-export strategy.

CC BY-SA 4.0: share with attribution under the same licence

On this page

Overview

The guide reminds readers that almost all the energy entering a data centre becomes waste heat, which is often released to the atmosphere by evaporating water in cooling towers. Its audience is local government officials around the world who typically know little about heat reuse but have the authority and means to encourage it. Heat reuse can lower energy costs, cut emissions, often reduce water use, and reduce a data centre's cooling electricity and the associated Scope 2 emissions.

The document groups offtake options by setting: high-density urban areas (district energy, building HVAC reheat, swimming pools, hospitals and hotels, wastewater treatment, care homes); intermediate-density urban areas (adding private district energy and industrial laundries); low-density areas (pools, hospitals and hotels, wastewater treatment); agriculture (biomass drying, farm heating, greenhouses, heat storage, ethanol production); coastal areas (desalination, fish farming); and industry (laundries, food processing, pre-heating, wastewater treatment and innovative technologies such as cooling production and carbon capture).

Named barriers are lack of awareness, missing links between data centres and nearby heat users, supply and demand mismatch, project trade-offs, cost justification, and a lack of supranational, national and sub-national incentive policy. Examples given are Equinix Paris heating the 2024 Olympics swimming pool, Stockholm Exergy connecting several data centres to its district heating network, the NREL Colorado data centre heating campus buildings, and Green Mountain Stavanger supplying heat to a lobster farm.

Four actions are recommended for local authorities: use financial incentives and regulatory mandates to address the barriers; make heat reuse a focus of economic development by connecting data centres with potential heat users; allow transition periods and facilitate early discussions (large data-centre projects take 18-24 months to plan, so authorities should engage during site selection and secure heat-reuse agreements before permit approval); and use infrastructure planning, for example zoning a data centre next to a brewery or greenhouses and planning pipeline connections.

Key points

  1. Large data-centre projects take 18-24 months to plan; authorities are advised to engage during site selection and secure heat-reuse agreements before permit approval.
  2. Offtake options are grouped by setting: dense urban (district energy, building HVAC reheat, pools), agriculture (greenhouses, biomass drying), coastal (desalination, fish farming) and industry.
  3. Named barriers: low awareness, missing links between data centres and heat users, supply and demand mismatch, cost justification and lack of policy incentives.
  4. Examples: Equinix Paris (2024 Olympics swimming pool), Stockholm Exergy, NREL Colorado and Green Mountain Stavanger.
  5. Heat reuse can reduce a data centre's cooling electricity and associated Scope 2 emissions, while offtakers replace fossil-fuel heat with cleaner heat.
  6. Advice to local authorities: financial incentives, connecting heat users with data centres, early engagement, and zoning heat users next to data centres.
  7. Data centres gain from faster permits, potentially lower cooling cost and better public perception.

Using it in design

  • At site selection, map potential heat offtakers nearby (district heating network, greenhouses, pools, industry) and add heat-reuse potential to the site scoring criteria.
  • Discuss the heat agreement with the municipality and heating-network operator before the permit application; using the document's 18-24 month planning time, place these talks early in the project schedule.
  • In cooling design, account from the start for heat output temperature, reserved space for heat export and the pipeline route (a line corridor on site).
  • Assess the mismatch between heat supply and offtaker demand (seasonal and load profile); where needed, keep heat storage or a backup heat-rejection path (cooling tower).
  • Include available incentives, support schemes and regulation (regional, national or EU level) for heat reuse in the feasibility study.

Who should read it

Municipal planners and local government officials, site-selection and development teams, and data-centre designers evaluating heat-reuse projects.

Document contents

  1. Compliance with Open Compute Project Tenets
  2. Introduction
  3. Challenges
  4. The Opportunity (offtake options and benefits, example projects)
  5. Action (local authority policies)
  6. Conclusion

Related standards

  • EN 50600-4-6 (ERF)
  • Directive (EU) 2023/1791 Article 26

Read the document

ocp-heat-reuse-local-authorities-guidelines-2024.pdf

PDF · 0.3 MB · English

CC BY-SA 4.0: share with attribution under the same licence

The document is provided unaltered because its licence permits redistribution.

Publication details

Authors
David Gardiner (DG&A); Otto Van Geet (NREL); Jaime Comella (AQ Compute); Bharath Ramakrishnan (Microsoft)
Publisher
Open Compute Project Foundation
Year
2024
Document number
V 1.00
Document language
English
Source type
Industry body
Access
Open licence (downloadable)
Licence
CC BY-SA 4.0: share with attribution under the same licence
Licence evidence
www.opencompute.org
Original licence note

Creative Commons Attribution-ShareAlike 4.0 International; licence verified from the licence statement in the document itself. Attribution to the authors and publisher is kept; adaptations must keep the same licence.

Citation

David Gardiner (DG&A); Otto Van Geet (NREL); Jaime Comella (AQ Compute); Bharath Ramakrishnan (Microsoft) (2024). Seizing Data Center Heat Reuse Opportunities: Guidelines for Local Authorities, V1.00 (OCP Heat Reuse). Open Compute Project Foundation. V 1.00. https://www.opencompute.org/documents/2024-09-ocp-hr-wp-2-pager-local-authorities-docx-1-pdf/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.