Overview

The paper introduces DC-WLC3O, a framework that simultaneously optimizes whole-life cost, whole-life carbon and material circularity index. It combines cradle-to-cradle life cycle assessment with dynamic material flow analysis, and uses a four-layer stack: Monte Carlo simulation, NSGA-III tri-objective Pareto optimization, Sobol' variance-based sensitivity analysis and Many-Objective Robust Decision Making (MORDM).

The framework evaluates 192 design configurations for a 30 MW hyperscale facility under three carbon pricing scenarios. Operational carbon dominates grid-dependent configurations (96.2%), while low-carbon energy produces an 8.5x inversion. Sobol' analysis confirms that energy strategy dominates carbon outcomes (S1 = 0.87).

On-site renewable energy combined with a full circular economy strategy is found unconditionally robust. The cost-circularity correlation is negative (rho = -0.488), which counters the assumption that circular strategies raise lifecycle cost in this model. The results are scenario outcomes and depend on energy, replacement and investment assumptions.

Key points

  1. 192 design configurations, a 30 MW hyperscale facility and three carbon pricing scenarios are evaluated.
  2. Operational carbon dominates grid-dependent configurations at 96.2%; low-carbon energy produces an 8.5x inversion.
  3. Energy strategy dominates carbon outcomes (Sobol' S1 = 0.87).
  4. On-site renewable energy with a full circular economy strategy is unconditionally robust (R = 0.056, stable across 94.2% of weight permutations).
  5. The cost-circularity correlation is negative (rho = -0.488).
  6. The finding holds under a +71% renewable LCOE perturbation; stability declines to about 80% under worst-case capital cost and to about 61% when generation degradation and battery replacement are combined.

Using it in design

  • In AI facility investment appraisals, score whole-life cost, carbon and circularity together rather than operating PUE alone.
  • Model carbon price as a scenario range instead of a single value and test option robustness across it.
  • Make the energy sourcing strategy (on-site renewable versus grid mix) the first row of the design decision matrix.

Who should read it

Planners and researchers making investment and sustainability decisions for large-scale AI facilities.

Publication details

Authors
Arezou Shafaghat; Da Hu; Ali Keyvanfar
Publisher
Buildings (MDPI AG)
Year
2026
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Article-specific publisher copyright/rights statement explicitly grants CC BY; version 4.0 is corroborated by publisher-deposited Crossref license metadata. Third-party material may have separate rights. Round 3/4 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Arezou Shafaghat; Da Hu; Ali Keyvanfar (2026). Whole-Life Carbon–Cost–Circularity Optimization for AI-Era Data Centers: A Robust Multi-Objective Framework Under Carbon Pricing Uncertainty. Buildings (MDPI AG). https://doi.org/10.3390/buildings16152961

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.