A 2026 Energies paper cuts total power by 17.24-33.55% (mean 27.34%) over 48 representative cases in a Nanjing data centre chilled-water plant using TRNSYS and jDE; the results are simulated.

On this page

Overview

The study by Ding and colleagues presents a plant-level supervisory optimisation framework combining TRNSYS operating scenarios, component-level surrogate models and self-adaptive differential evolution (jDE). The system has three chillers, three cooling towers, three chilled-water pumps and three cooling-water pumps. Decision variables are cooling-tower approach temperature difference, cooling-water temperature difference, chilled-water temperature difference and the common cooling-tower fan frequency; chilled-water supply temperature is examined separately over 14-18 degrees C.

Across 48 representative cases from four seasonal days, optimised operation reduces total power by 17.24-33.55% (mean 27.34%) and raises system COP by 20.78-50.42% (mean 38.12%), relative to matched baseline values at the same timestamps. Savings come mainly from pump and cooling-tower relief, with chiller power changes secondary and season dependent. All results come from matched simulation evaluations, not field measurements.

Key points

  1. Total power falls by 17.24-33.55% over 48 representative cases, mean 27.34%.
  2. System COP rises by 20.78-50.42%, mean 38.12%.
  3. The system has three chillers, three cooling towers, three chilled-water pumps and three cooling-water pumps.
  4. Savings come mainly from pump and cooling-tower relief.
  5. Optimised cooling-water supply temperatures range from 20.05 to 27.75 degrees C.
  6. Results are matched simulation evaluations, not field measurements.

Using it in design

  • For central chilled-water plants, evaluate a supervisory control strategy that optimises chillers, towers and pumps together at design stage.
  • Define tower fan frequency and temperature-difference setpoints as variables of plant-level energy optimisation.
  • Verify the simulated saving by field measurement after commissioning.
  • Keep the cooling-water temperature floor within the chiller manufacturer's operating limits.

Who should read it

Engineers working on data centre chilled-water plant control and energy optimisation.

Publication details

Authors
Weike Ding; Kexin Guo; Li Wang; Da Feng; Chong Chen; Bo Xu
Publisher
Energies (MDPI AG)
Year
2026
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Article-specific publisher copyright/rights statement explicitly grants CC BY; version 4.0 is corroborated by publisher-deposited Crossref license metadata. Third-party material may have separate rights. Round 3/4 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Weike Ding; Kexin Guo; Li Wang; Da Feng; Chong Chen; Bo Xu (2026). Adaptive Global Control with jDE and Grid Search for Energy-Saving Optimization of Data Center Central Air Conditioning Systems. Energies (MDPI AG). https://doi.org/10.3390/en19092126

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.