Power Distribution in Data Centers: STARLINE Track Busway, PX iPDUs and Power IQ

Raritan

A 2016 white paper from Raritan that argues for replacing underfloor-cabled PDU and RPP layouts with overhead track busway, 400 V intelligent rack PDUs and power management software. It states that carrying 400 V to the rack cuts energy cost by about 2% to 3% against 208 V distribution and 4% to 5% against 120 V.

On this page

Overview

The nine-page paper starts from the pressure on data-centre managers to deliver more computing with less energy in less space. Its core argument is a lifetime mismatch: facilities are designed for 10 to 15 years while IT equipment is refreshed every 2 to 5 years. Rack density is described as 5 to 10 kW for medium and 15 to 30 kW for high density, and a single rack may mix single-phase and three-phase loads and different receptacle types. If the power infrastructure cannot adapt under those conditions, nothing else in the data centre can change quickly.

The traditional arrangement is criticised: PDUs feeding remote power panels (RPPs), which feed racks through whips under a raised floor. The paper lists its drawbacks: floor space taken by distribution equipment, the cost of raised floors, cable congestion that disrupts cooling airflow, the need to remove abandoned cables, and human error when working with breakers that are not clearly tied to a load. Because every outlet has to be planned in advance, the designer either overbuilds at the start or accepts costly changes later that carry outage risk.

The first part of the proposed answer is overhead busway. Systems made of straight busbar sections with a continuous access slot and tap boxes containing circuit protection and wiring devices are available up to 400 A and 600 V, AC and DC. A tap box plugs in anywhere along the run, with the breaker at the point of use. Adding, moving or changing outlets needs no work on live panels and no scheduled outage. Removing RPPs frees usable space, and clearing the underfloor eases airflow. Power feed monitoring units measure each phase current in real time.

The second part is 400 V distribution. Converting power that typically arrives at 480 V three-phase in North America to 208/120 V causes about 4% loss. Inside the rack PDU, line to neutral gives 230 V, which suits universal power supplies working between 100 and 240 V. The paper also puts power-supply loss at 18% at 120 V and 15% at 230 V, and calculates a total net improvement of 7%. Under the NEC, branch circuits are protected at 20 A or less, and intelligent PDUs monitor breaker current and phase imbalance.

The third part is power management software, which gathers data from PDUs and meters of different vendors and reports energy, capacity and rack temperature. The paper closes with selection criteria for busway, intelligent PDUs and software. It is a vendor publication that promotes Raritan and STARLINE products; the efficiency percentages are given without a source or measurement method and apply to North American sites fed at 480 V. In Turkey and Europe, where 400/230 V is already standard, the conversion saving does not arise in the same way, and the density examples predate 2016.

Key points

  1. Data-centre design life is 10 to 15 years, while IT equipment refresh cycles are 2 to 5 years.
  2. Density classes: medium 5 to 10 kW per rack, high 15 to 30 kW per rack.
  3. Overhead busway systems are available up to 400 A and 600 V, AC and DC.
  4. Conversion from 480 V to 208/120 V causes about 4% loss; keeping 400 V to the rack removes it.
  5. Power-supply loss is given as 18% at 120 V and 15% at 230 V; the two effects together give a 7% net improvement.
  6. 400 V distribution lowers energy cost by about 2% to 3% against 208 V and 4% to 5% against 120 V.
  7. Typical arrangement: two intelligent rack PDUs per cabinet, three input lines and three circuits (L1+N, L2+N, L3+N), each with a 20 A breaker or fuse.
  8. Billing-grade accuracy of ±1% is recommended for energy (kWh) metering.
  9. Temperature sensors go on the cool-air inlet side of the rack at bottom, middle and top; one humidity sensor per rack is sufficient.
  10. Busway sections should be as long as possible (up to 20 feet) to reduce the number of joints.

Using it in design

  • Where rack layout and density are not fixed, or fill-out is phased, consider overhead busway as an alternative to RPPs and underfloor whips, and compare the busway rating with the target power per row.
  • Put per-phase current monitoring at the busway feed and distribute tap boxes evenly across the three phases.
  • On three-phase rack PDUs, define alarm thresholds for phase imbalance and branch breaker current; unbalanced load can overload the neutral conductor.
  • Where tenant billing or PUE reporting is planned, require kWh metering at ±1% accuracy on rack PDUs.
  • Plan temperature sensors at the bottom, middle and top of each rack on the cold-aisle side, plus one humidity sensor per rack.
  • Treat the 2% to 5% savings figures as specific to 480 V North American systems, and do not count that gain in 400/230 V projects.

Who should read it

Electrical engineers designing final distribution in data halls, operations teams selecting rack PDUs and monitoring, and planners of colocation sites that are built out in phases.

Document contents

  1. Overview
  2. Trends
  3. Traditional Power Solutions: Too Much or Too Little
  4. Today’s Power Solutions: Flexible and Adaptable
  5. Overhead Track Busways: Easy, Fast and Inexpensive To Change
  6. Sustainable, Scalable, More Usable Data Center Space, Monitored Power Usage
  7. 400V Intelligent Rack PDUs: Accurate, Intelligent Power Delivery, Monitoring and Management
  8. Cost Savings, Power to Spare, Environmental Monitoring
  9. Data Center Power Management Software: Powerful Data Collection and Reporting at Your Fingertips
  10. Product Selection
  11. Powering the Data Centers of the Future

Publication details

Authors
Raritan
Publisher
Raritan
Year
2016
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Publisher source opened. No document-specific commercial redistribution permission established; link and original metadata only.

Citation

Raritan (2016). Power Distribution in Data Centers: STARLINE Track Busway, PX iPDUs and Power IQ. Raritan. https://raritan.com/assets/re/resources/white_papers/White_Paper_-_Power_Distribution_In_Data_Centers.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.