Technical guideFree to read2024

TEIAS Sustainability Report 2024

Original title TEİAŞ Sürdürülebilirlik Raporu 2024

Türkiye Elektrik İletim A.Ş.

The 2024 report of Turkish Electricity Transmission Corporation (TEIAS) describes a grid of 75,731 km of lines and 800 substations, a 2.06% transmission loss and 116,244.2 MW of installed capacity (solar up 4,594.9 MW).

On this page

Overview

The report presents TEIAS's sustainability activities for 1 January-31 December 2024 in line with the GRI 2021 standard and has not been externally assured. Its six main parts are corporate profile, sustainability structure, corporate governance, infrastructure and development, environmental management, and people and society. The transmission system is operated with 75,731 km of lines, 800 transformer substations, 22 regional directorates and 10 load dispatch centres.

For a data-centre designer the most relevant part is infrastructure and development. The report gives the 2024 transmission loss as 2.06%. For grid reliability it describes 3,347 faults detected by drone, 8,422 km of LiDAR scanning, live-line maintenance and mobile substations. Installed capacity rose 6.84% to 110,914 MW at end-2023 and 4.76% to 116,244.2 MW at end-2024; the 2024 change was solar +4,594.9 MW, wind +1,064.1 MW, hydro +240.5 MW, geothermal +42.2 MW and thermal -664.4 MW.

The 2024 generation mix was: dam hydro 16.12%, natural gas 18.89%, imported coal 21.25%, lignite 11.98%, wind 10.39%, solar 8.67%, run-of-river and lakes 4.99%, geothermal 3.14%. The report also covers interconnection progress: exports to Iraq at 300 MW began on 21 July 2024, and work continues on the 400 kV Tortum-Akhaltsikhe line with Georgia, which will add 350 MW at the earliest in 2031. Transmission investment for renewable integration is being increased in line with the national 2053 net-zero goal.

The report is not a data-centre-specific document and contains no data-centre connection, capacity allocation or grid-connection rules. Its value is as an official source documenting the structure of the Turkish transmission grid to which a data-centre site would connect, its reliability practices, loss level and generation mix.

Key points

  1. Transmission system: 75,731 km of lines, 800 substations, 22 regional directorates, 10 load dispatch centres, 17,481 employees.
  2. 2024 transmission loss was 2.06%.
  3. Installed capacity was 110,914 MW at end-2023 (+6.84%) and 116,244.2 MW at end-2024 (+4.76%).
  4. 2024 capacity change: solar +4,594.9 MW, wind +1,064.1 MW, hydro +240.5 MW, geothermal +42.2 MW, thermal -664.4 MW; total +5,277.9 MW.
  5. 2023 capacity additions totalled 7,104.7 MW, of which 6,187.9 MW was solar.
  6. 2024 generation shares: imported coal 21.25%, natural gas 18.89%, dam hydro 16.12%, lignite 11.98%, wind 10.39%, solar 8.67%, run-of-river and lakes 4.99%, geothermal 3.14%.
  7. In 2024, 3,347 faults were found by drone and 8,422 km were scanned by LiDAR.
  8. Exports of 300 MW to Iraq began on 21 July 2024; the 400 kV Tortum-Akhaltsikhe line will add 350 MW at the earliest in 2031.
  9. Strategic plan 2024-2028: 4 goals, 18 strategic objectives, 74 performance indicators.

Using it in design

  • For a data-centre site, confirm the transmission reliability and voltage level (66, 154, 220, 400 kV) at the connection point with TEIAS in pre-consultation, and use the 2.06% loss level as context for grid-loss assumptions.
  • In regions where installed capacity is growing mainly in solar, add grid flexibility and renewable-integration investments to the connection programme risk analysis.
  • In carbon accounting, place the grid mix (coal and natural gas about 52%) in context with the 2024 generation distribution; for the emission factor use the ministry's annually published factors.
  • In outage risk assessment, take into account the report's drone, LiDAR and live-line practices and mobile substation capacity, and determine the need for a redundant connection.

Who should read it

Engineers selecting data-centre sites and planning grid connection in Turkey, energy planners, and sustainability reporting teams.

Document contents

  1. About the report
  2. Message from the General Manager
  3. 01 About TEIAS (history, mission and vision, strategic goals, key figures, memberships)
  4. 02 TEIAS sustainability structure (outlook and governance, stakeholder engagement, priorities)
  5. 03 Strong corporate structure (governance, integrated management system, economic performance, risk management, internal audit, business ethics)
  6. 04 Infrastructure and development (grid reliability, system operation performance, readiness for supply growth, renewable transmission infrastructure, R&D, digitalisation, cyber security)
  7. 05 Environmental management (energy efficiency, circular economy, climate adaptation, biodiversity)
  8. 06 People and society
  9. 07 Appendices (performance indicators, GRI index)

Publication details

Authors
Türkiye Elektrik İletim A.Ş.
Publisher
Türkiye Elektrik İletim A.Ş.
Year
2024
Document number
2024 raporlama dönemi
Document language
Turkish
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Açık erişim yeniden dağıtım izni anlamına gelmez; açık yeniden dağıtım lisansı saptanmadı. Kütüphanede tam metin yayımlanmaz. Yıl alanı raporlama dönemidir; kesin yayım tarihi doğrulanmadı. S.46 yıl toplamları ve artış sayıları kendi içinde doğrudan uzlaşmıyor; sayılar güncel kapasite varsayılanı olarak kullanılmamalı.

Citation

Türkiye Elektrik İletim A.Ş. (2024). TEİAŞ Sürdürülebilirlik Raporu 2024. Türkiye Elektrik İletim A.Ş.. 2024 raporlama dönemi. https://webim.teias.gov.tr/file/10ac6692-72f3-46a4-85ce-66eb52d72cd0?download=

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.