Technical guideFree to readYear not stated

Diesel Generator Maintenance and Operation Manual

Tescom Elektronik Sanayi Ticaret A.Ş. · Tescom

A 36-page manual from Tescom Elektronik covering the siting, electrical connection, operation and maintenance of Tescom diesel generating sets: first maintenance at 50 running hours, later maintenance every 200 hours or once a year, and a target earthing resistance of at most 2 Ω.

On this page

Overview

The manual is a general maintenance and user document prepared by Istanbul-based Tescom Elektronik Sanayi Ticaret A.Ş. for a wide range of products. The introduction sets out basic electrical concepts and the classification of generators by operating time. Emergency standby power (ESP) is limited to 200 hours a year under variable load and cannot be exceeded. Limited-time running power (LTP) allows up to 500 hours a year. Prime power (PRP) suits year-round operation under variable load and permits 10% overload for 1 hour in 12. Continuous power (COP) is 20% below PRP.

The safety chapter covers lifting, moving parts, hot surfaces, fire, toxic substances, electricity and noise. Lifting equipment must withstand at least 10% more than the gross weight of the set, and the set is lifted from the lugs on the chassis. An open set produces 90 to 110 dBA at 1 metre, and prolonged exposure above 85 dBA is hazardous to hearing. The parts chapter presents the engine, alternator, chassis and fuel system, exhaust, battery and panels. The daily fuel tank is in the chassis up to 1125 kVA standby power; above that, external tanks are used.

The site selection and installation chapter is the densest part for a designer. The floor must carry the wet weight of the set and its static and dynamic loads, with enough free space around it for service. With more than one unit, the interaction between hot-air discharge and fresh-air intake is taken into account. In a generator room the fresh-air inlet cross-section must be larger than the hot-air outlet, and airflow should run from behind the alternator towards the radiator. Rooms below ground level need ventilation ducts instead of louvres. Space is reserved for exhaust, fuel piping, cable and busbar routes.

The electrical section requires cables to be calculated from load current, voltage and voltage drop, with voltage drop confirmed separately for distances over 50 metres and phase sequence checked after connection. The alternator output is connected to a busbar run not directly but through an interconnection box, using cable or flexible bars. The control panel monitors mains voltage with phase-to-neutral limits of 180 and 250 V. Maintenance includes a weekly check, a 15-minute test run and replacement of the coolant every 2 years. The warranty is 1 year or 500 running hours.

Key points

  1. Power classes: ESP limited to 200 hours a year; LTP up to 500 hours a year; PRP continuous with 10% overload for 1 hour in 12; COP 20% below PRP.
  2. Lifting equipment and the supporting surface must carry at least 10% more than the gross weight of the set.
  3. Noise of an open set is 90...110 dBA at 1 m; prolonged exposure above 85 dBA is hazardous.
  4. The daily fuel tank is in the chassis up to 1125 kVA standby power; external tanks are used above that.
  5. In a generator room the fresh-air inlet cross-section must be larger than the hot-air outlet cross-section.
  6. Target earthing resistance is at most 2 Ω; the generator must not run without earthing.
  7. Voltage drop is calculated for cable runs over 50 metres; the alternator output connects to a busbar through an interconnection box.
  8. At the transfer panel, fuse and switch capacity may fall when ambient temperature exceeds 40 °C; the control cable is 7 x 2.5 mm² NYMHY.
  9. Mains monitoring limits are programmed at 180 V lower and 250 V upper, phase to neutral.
  10. Maintenance: first service at 50 hours, then every 200 hours or once a year (whichever comes first); weekly check and 15-minute test; coolant and antifreeze replaced every 2 years.

Using it in design

  • Select generator power by duty: ESP (200 hours a year) for mains backup, and PRP where long or continuous running is expected.
  • In generator-room ventilation, design the inlet louvre area larger than the outlet area, and prevent hot-air discharge from recirculating into the intake of a neighbouring unit.
  • Use wet weight, dynamic loads and at least a 10% margin for the floor or foundation, and leave doors and a transport route so the unit can be removed whole in future.
  • Use the 2 Ω target in the earthing design and verify it by measurement at commissioning; add the phase-sequence check to the commissioning list.
  • Where the distance between generator and transfer panel exceeds 50 metres, calculate voltage drop; on a busbar output, provide a flexible connection and an interconnection box.
  • Write the weekly check, the 15-minute no-load test and the 200-hour or annual service into the maintenance plan, and confirm model-specific instructions and the fire regulations in force separately.

Who should read it

Electrical and mechanical engineers designing backup power systems, project teams laying out generator rooms, and facility maintenance managers.

Document contents

  1. Introduction (definitions, basic electrical concepts, classification by operation time)
  2. Safety Precautions
  3. Generator Set and Parts
  4. Selection of Generator Site and Installation (canopy and open type layout, electrical connections, transfer panel, starting)
  5. Fault Detection
  6. Maintenance of Generator (first maintenance, 200 hours / annual maintenance, periodic maintenance)
  7. Warranty
  8. Maintenance Tracking Chart

Publication details

Authors
Tescom
Publisher
Tescom Elektronik Sanayi Ticaret A.Ş.
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Tescom Diesel Generator Maintenance and Operation Manual. Tescom Elektronik Sanayi Ticaret A.Ş.. https://www.tescomakademi.com/doc/Tescom-Diesel-Generator-Maintenance-and-Operation-Manual.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.