Texas Senate Bill 6 (89th Legislature): planning for, interconnecting, operating and paying costs for service to certain electrical loads - enrolled text
Texas Legislature · Texas Legislature (author: Sen. King)
Texas law signed on 20 June 2025 setting rules for large loads (75 MW and above by default) connecting to the ERCOT grid.
On this page
Overview
It covers interconnection standards, site control and financial security, mandatory disclosure of on-site backup generation, curtailment during firm load shed, an emergency demand-reduction product and review of co-location with existing generators. Directly affects how data centres in ERCOT plan backup generators and grid connection.
Related standards
- NFPA 110
Publication details
- Authors
- Texas Legislature (author: Sen. King)
- Publisher
- Texas Legislature
- Year
- 2025
- Document number
- SB 6 (89R)
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
- Licence evidence
- www.law.cornell.edu
Original licence note
Enacted state legislation; statutory text is public law and not copyrightable (government edicts doctrine, Georgia v. Public.Resource.Org, 2020).
Citation
Texas Legislature (author: Sen. King) (2025). Texas Senate Bill 6 (89th Legislature): planning for, interconnecting, operating and paying costs for service to certain electrical loads - enrolled text. Texas Legislature. SB 6 (89R). https://capitol.texas.gov/tlodocs/89R/billtext/html/SB00006F.htm
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.