Regulation on Service Quality of Electricity Distribution and Retail Sales
Original title Elektrik Dağıtımı ve Perakende Satışına İlişkin Hizmet Kalitesi Yönetmeliği
Enerji Piyasası Düzenleme Kurumu
The regulation published in Official Gazette no. 31349 of 29 December 2020, in EPDK's current consolidated text (with 2025 amendments), governing supply continuity, commercial and technical quality and interruption compensation.
On this page
Overview
The regulation sets rules for the quality of electricity distribution and retail sales under three headings: supply continuity, commercial quality and technical quality. The distribution company records every interruption by source (transmission, distribution MV, distribution LV), duration (long, short), cause (force majeure, safety, external, network operator) and whether it was notified. Article 48 repeals the earlier regulation of 21 December 2012, and Article 49 sets entry into force on 1 January 2021.
Indicator calculation covers average interruption duration and frequency indicators such as SAIDI and per-user TKSURE and TKSAYI values. Annual interruption compensation is paid without a user application when unnotified-interruption thresholds in Table 9-A are exceeded. For urban MV users the unnotified thresholds are 20 hours and 36 interruptions a year; for LV 42 hours and 48, for semi-urban MV 24 hours and 42, and for rural MV 32 hours and 48. For notified interruptions the threshold is 48 hours and 12 interruptions, and the excess is added to unnotified interruptions.
The compensation formula is built from a fixed fee (40 TL for duration, 20 TL for count), the excess over the threshold, a coefficient K of 2, the distribution charge and hourly average demand; the higher of the duration and count compensation is paid. Force majeure and safety interruptions are not counted. Long-interruption compensation is paid for interruptions caused by the network operator or external causes lasting over 10 hours in urban areas, 11 in semi-urban and 12 in rural: 80 TL for residential users under 160 kVA contract power, 160 TL for other users, 480 TL for 160-630 kVA and 960 TL above 630 kVA.
The user damage article covers equipment damage from distribution-system quality problems: a claim within 30 days, a decision within 10 working days and repair within at most 15 days. The thresholds in the document are regulatory compensation conditions and do not mean guaranteed supply reliability for a data centre.
Key points
- Article 48 repeals the 21 December 2012 regulation; Article 49 sets entry into force on 1 January 2021.
- Table 9-A: urban MV unnotified thresholds are 20 hours and 36 interruptions; urban LV 42 hours and 48 interruptions.
- Semi-urban MV 24 hours and 42; semi-urban LV 48 and 52; rural MV 32 and 48; rural LV 56 and 56.
- For notified interruptions the threshold is 48 hours and 12 interruptions in all regions; the excess is added to unnotified.
- Transmission-origin thresholds (Table 9-B): unnotified 8 hours and 12 interruptions; notified 24 hours and 6.
- In the compensation formula the fixed fee is 40 TL (duration) and 20 TL (count), K = 2; the higher of the two is paid.
- Long-interruption threshold: urban 10 hours, semi-urban 11 hours, rural 12 hours.
- Long-interruption compensation: residential under 160 kVA 80 TL, other 160 TL, 160-630 kVA 480 TL, above 630 kVA 960 TL.
- Total annual compensation is capped at 1 percent of the system operation revenue cap; the monthly cap for long-interruption compensation is 0.4 percent.
- An equipment damage claim is made within 30 days; if rejected, a reasoned report follows within 10 working days.
Using it in design
- Do not base a data-centre supply reliability target on the regulation's thresholds; they are compensation conditions, not a design guarantee.
- For an MV-connected site, note the compensation thresholds (for example urban MV 20 hours, 36 interruptions) as a reference for expected external outages and for UPS and generator runtime calculations.
- Use the contract power class (160, 630 kVA) in compensation calculations and contract planning.
- Keep interruption and technical quality records (meter data) for the equipment damage process; the claim window is 30 days.
- Add the area type (urban, semi-urban, rural) and voltage level to site selection and supply architecture decisions.
Who should read it
Electrical engineers evaluating data-centre site selection and supply architecture, and legal and contract managers.
Document contents
- Part one: purpose, scope, definitions
- Part two: service quality of electricity distribution (supply continuity, commercial quality, technical quality, compensation of user damage)
- Part three: service quality of electricity retail sales
- Part four: entry into force and execution
- Annexes: interruption record tables and threshold tables (Table 9-A and 9-B)
Publication details
- Authors
- Enerji Piyasası Düzenleme Kurumu
- Publisher
- Enerji Piyasası Düzenleme Kurumu
- Year
- 2020
- Document number
- RG 29.12.2020 / 31349
- Document language
- Turkish
- Source type
- Turkish regulation
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official EPDK current-document index lists update 23.10.2025. Public Word document downloaded and converted locally to read tables 9–12. This is a successor regulation, not a duplicate of the 2012 source.