Uptime Institute's May 2024 survey (964 respondents) finds 22% of organisations use direct liquid cooling, 61% do not but would consider it, and nearly half of users have under 10% of racks on DLC.

On this page

Overview

The document presents the direct liquid cooling (DLC) results of Uptime Institute's Data Center Cooling Systems Survey, run from 8 February to 13 March 2024 with 964 industry respondents. Questions were answered by data centre owner-operators, except one (the rack density at which DLC becomes necessary), which vendors and product providers also answered.

On adoption, 22% of respondents report some use of DLC and 61% do not use it but would consider it in future. Nearly half of DLC users have DLC in under 10% of IT racks; 30% use it in only a few servers and 47% in some IT racks. Use is therefore limited to a small share of servers and racks while interest stays high. Among types in use, water-cooled cold plates lead (64%) and dielectric-cooled cold plates follow at 30%; full immersion, partial immersion and two-phase systems have smaller shares.

The document also charts the benefits that would convince organisations to increase DLC (need for higher-powered servers and denser racks, energy savings, sustainability, power efficiency, smaller footprint), the major barriers (increased cost, reliability concerns, limited equipment or vendor choice, maintenance issues) and the rack power density at which air cooling becomes too costly. It reports survey results only, without interpretation or design method.

Key points

  1. Survey ran 8 February to 13 March 2024 with 964 respondents.
  2. 22% of respondents use DLC to some extent; 61% do not but would consider it.
  3. Nearly half of DLC users have under 10% of racks on DLC.
  4. 30% of users use DLC in only a few servers and 47% in some IT racks.
  5. Types in use: water-cooled cold plates 64%, dielectric-cooled cold plates 30%.
  6. Benefits that would increase DLC use: need for higher-powered servers and denser racks, energy savings, sustainability, power efficiency, smaller footprint.
  7. Major barriers: increased cost, reliability concerns, limited equipment or vendor choice, maintenance issues.
  8. Results are also broken down by data centre size.

Using it in design

  • Use the small current rack share of DLC as market context in the business case for liquid cooling.
  • Plan air-cooled and DLC racks together in hybrid halls; most users report mixed use.
  • Treat water-cooled cold plates as the dominant option and consider dielectric cold plates and immersion as secondary.
  • Turn the barrier list (cost, reliability, vendor limits, maintenance) into a risk register and commissioning plan.
  • Use the survey's density threshold distribution together with your own load profile, not on its own.

Who should read it

Data centre owners, operations managers and designers building a liquid cooling transition strategy.

Document contents

  1. Summary and about the survey
  2. 2024 use of direct liquid cooling
  3. Types of DLC being used
  4. Percentage of IT racks with DLC
  5. Use by size of largest data center
  6. Overall level of DLC adoption
  7. Key benefits of DLC
  8. Threshold for DLC by rack power density
  9. Major barriers of DLC

Publication details

Authors
Uptime Institute
Publisher
Uptime Institute
Year
2024
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Uptime Institute survey summary; proprietary, no open licence.

Citation

Uptime Institute (2024). Uptime Institute 2024 Cooling Systems Survey: Direct Liquid Cooling Results. Uptime Institute. https://datacenter.uptimeinstitute.com/rs/711-RIA-145/images/2024.Cooling.Survey.Report.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.