A July 2025 Uptime Intelligence report finding, from the Uptime Institute Cooling Systems Survey 2025, that direct liquid cooling (DLC) adoption is gradual and most operators still rely on air cooling.

On this page

Overview

Uptime Intelligence data report 181 (July 2025) is based on results of the Uptime Institute Cooling Systems Survey 2025. It shows that direct liquid cooling (DLC) adoption is gradual and that most operators still rely on traditional air cooling for IT equipment.

High rack density is the top driver for DLC, with environmental sustainability another driving factor. Operators most often judge whether a liquid cooling system is viable by how readily it integrates into existing infrastructure.

The report notes that this may shift as rack densities increase and the cost of maintaining air cooling rises.

Key points

  1. The report draws on the Uptime Institute Cooling Systems Survey 2025.
  2. DLC adoption is gradual; most operators still use air cooling.
  3. High rack density is the top driver for DLC.
  4. Environmental sustainability is another driver.
  5. Ease of integration with existing infrastructure is the most common viability test.

Using it in design

  • When planning a DLC move, make integration with existing infrastructure the primary selection criterion.
  • Document the rack density target as the main input to the DLC case.
  • Keep hybrid hall layouts that retain air cooling for a period among the options.

Who should read it

Data centre operators and designers setting cooling technology strategy.

Publication details

Authors
Rose Weinschenk; Uptime Institute Intelligence
Publisher
Uptime Institute
Year
2025
Document number
UII Data Report 181
Document language
English
Source type
Industry body
Access
Citation only
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Uptime Intelligence report; full text requires subscription or evaluation access.

Citation

Rose Weinschenk; Uptime Institute Intelligence (2025). DLC adoption remains slow and steady (UII Data Report 181, July 2025). Uptime Institute. UII Data Report 181. https://intelligence.uptimeinstitute.com/resource/dlc-adoption-remains-slow-and-steady

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.