Technical guideFree to read2025

How Data Centers Can Solve Their Water Consumption Challenge

Veolia Water Technologies · Ann Feng, David Kirkland

A July 2025 Veolia Water Technologies article on alternative cooling water sources and an Illinois retrofit where acid-dosed control doubled tower cycles, cut water 50% and saved 12 million gallons a year.

On this page

Overview

This short manufacturer-authored article addresses the water demand of data-centre cooling. Citing the IEA, it states a typical 100 MW US hyperscale data centre consumes about 2 million litres of water a day, equivalent to 6,500 homes. Water and other liquids can transfer heat 50 to 1,000 times more efficiently than air, which is why water-based cooling is common; unlike continuously used towers or adiabatic systems, many advanced liquid cooling loops are filled once and need less than 500 to 1,000 gallons a year in a 10,000-gallon system.

The alternative sources section lists treated municipal wastewater, on-site rainwater collection and surface water such as canals or lakes; Google's Netherlands facility uses canal water instead of potable water. According to the article, these sources reduce pressure on drinking water and can ease permitting in water-stressed regions. Citing Bloomberg, two-thirds of new US data centres built since 2022 are in areas already facing water stress.

In the Illinois example the existing alkaline cooling programme limited tower cycles of concentration and caused high blowdown that raised make-up water demand. Veolia installed a TrueSense Ready-Set-Go controller that monitors pH, feeds sulfuric acid and gives remote alarms. The new programme doubled tower cycles and reduced water needed by 50%, saving 12 million gallons a year and $150,000. The article also mentions immersion cooling and hybrid approaches as future options.

Key points

  1. Citing the IEA, a typical 100 MW US hyperscale data centre uses about 2 million litres of water per day (6,500 homes).
  2. Water and other liquids can transfer heat 50-1,000 times more efficiently than air.
  3. Fill-once liquid cooling loops need less than 500-1,000 gallons a year in a 10,000-gallon system.
  4. Two-thirds of new US data centres built since 2022 are in water-stressed areas (citing Bloomberg).
  5. Alternative sources: treated wastewater, rainwater collection, surface water (Google's Netherlands site uses canal water).
  6. The workflow starts by identifying local water sources, then selecting treatment and chemistry programmes.
  7. In Illinois, acid-dosed pH control doubled tower cycles and cut water needed by 50%.
  8. The result was 12 million gallons of water and $150,000 saved annually.
  9. The EU adopted data-centre water use reporting requirements last year.

Using it in design

  • When selecting cooling water sources, assess treated wastewater, rainwater and surface water alongside mains water, and define a source-specific treatment and chemistry programme.
  • Define cycles of concentration and blowdown rate as tower operating targets and design measurement points for pH monitoring and chemical dosing control.
  • Integrate controllers with the BMS (building management system) for remote alarms and monitoring.
  • For existing plants on alkaline programmes, assess the effect of moving to an acid programme on cycles of concentration.
  • Show fill and maintenance water for liquid cooling loops separately in the annual demand calculation.

Who should read it

Engineers and operations managers working on data-centre cooling water treatment and cooling tower operation.

Document contents

  1. Alternative Water Sources
  2. How Veolia Helps Data Centers
  3. Illinois Data Center Example
  4. A Forward-Looking Partner

Publication details

Authors
Ann Feng; David Kirkland
Publisher
Veolia Water Technologies
Year
2025
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public manufacturer source inspected. No redistribution permission established. Metadata and original brief summaries only; local files are research evidence, not a redistribution package.

Citation

Ann Feng; David Kirkland (2025). How Data Centers Can Solve Their Water Consumption Challenge. Veolia Water Technologies. https://blog.veoliawatertechnologies.com/en/how-data-centers-can-solve-their-water-consumption-challenge

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.