Beyond PUE: A Local-Impact Audit Framework for Data Center Environmental Accountability

arXiv preprint (cs.CY; formatted for ACM e-Energy '26) · Sharifa Sultana, Syed Ishtiaque Ahmed

The authors argue that PUE, WUE and CUE describe how efficiently a facility turns resources into IT energy but say nothing about local resource scarcity, grid headroom or community impact, which is what drives current US siting disputes.

CC BY 4.0 — share with attribution

On this page

Overview

Standard data-centre sustainability metrics (PUE, WUE, CUE) measure a facility's resource use and emissions intensity normalised to IT energy use, without directly representing local resource scarcity, infrastructure capacity or social footprint. This gap has become politically consequential: in the first quarter of 2026 alone, local opposition delayed or cancelled roughly $130 billion in projects across the United States. Uptime Institute's 2024 survey average PUE is 1.56, flat for five years, and only 41% of operators track water use; an estimated 40% of US data centres sit in regions of high or extreme water stress.

The authors propose a five-category, 0-100 audit score: energy, water stewardship, carbon/renewables, regulatory compliance and local disclosure. Base weights: energy efficiency 20% (PUE, ERE); water stewardship 25% (WUE, withdrawal versus permit cap, source type potable/reclaimed/seawater, % returned as wastewater); carbon/renewables 20% (CUE, renewable %, with 24/7 hourly matching weighted above annual matching). The design rests on four principles: weights adjusted for water stress and grid conditions, a compliance gate, a five-level data-verification maturity ladder, and quarterly trend reporting.

The water stewardship weight is raised according to a regional water-stress index (WRI Aqueduct), and the carbon weight is adjusted for local grid carbon intensity and headroom, so identical operating figures can score differently depending on location. Compliance gate: any unresolved major regulatory violation caps the composite score at a ceiling of 40 (suggested, subject to calibration) no matter how well the facility performs in other categories. Five-level verification maturity ladder for each metric: L0 no public data; L1 operator projection with no enforcement; L2 permitted cap with contractual penalties but no independent metering; L3 third-party (utility) metering verifying the cap; L4 continuous verification.

Applying it to three Illinois projects shows public records cannot support a verified score for any of them without a contracted audit relationship. Example: Project Cardinal (Yorkville) water projections moved from 500,000 to 310,000 to 350,000 gal/day, then to 42,500 gal/day after a redesign to air-cooled, closed-loop cooling, with a contractual penalty above 71,400 gal on any single day. Limits: the framework covers only on-site water and energy and does not yet include indirect water consumed in electricity generation; the weights and thresholds (for example the compliance ceiling of 40) are suggested and subject to calibration. It is a preprint.

Key points

  1. Base weights: energy efficiency 20% (PUE, ERE); water stewardship 25% (WUE, withdrawal versus permit cap, source type, % returned as wastewater); carbon/renewables 20% (CUE, renewable %, 24/7 hourly matching weighted above annual matching).
  2. The water stewardship weight is raised according to a regional water-stress index (WRI Aqueduct) and the carbon weight is adjusted for local grid carbon intensity and headroom, so identical operating figures can score differently by location.
  3. Compliance gate: any unresolved major regulatory violation caps the composite score at a ceiling of 40 (suggested, subject to calibration).
  4. Five-level verification maturity ladder: L0 no public data; L1 operator projection with no enforcement; L2 permitted cap with contractual penalties but no independent metering; L3 third-party metering verifying the cap; L4 continuous verification.
  5. Uptime Institute's 2024 survey average PUE is 1.56, flat for five years, and only 41% of operators track water use; an estimated 40% of US data centres sit in regions of high or extreme water stress.
  6. Project Cardinal (Yorkville) water projections moved from 500,000 to 310,000 to 350,000 gal/day, then to 42,500 gal/day after a redesign to air-cooled, closed-loop cooling, with a contractual penalty above 71,400 gal on any single day.
  7. Limitation: the framework covers only on-site water and energy and does not yet include indirect water consumed in electricity generation.

Using it in design

  • In siting and community-acceptance files, present PUE, WUE and CUE together with regional water stress, grid headroom and verification maturity (L0-L4); back project commitments with contractual limits and independent metering (L2-L3).
  • Define water design commitments by permit cap, source type (potable, reclaimed, seawater) and share returned as wastewater; redesign to air-cooled closed loop cut daily withdrawal from 350,000 to 42,500 gal/day.
  • Use a five-category audit score of this kind as a screening tool for local opposition risk, but state that weights and thresholds are suggested and subject to calibration.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Planners and policy specialists preparing data-centre siting, environmental accountability and local community-acceptance files.

Document contents

  1. Introduction
  2. Proposed local-impact audit framework (five categories, weights, compliance gate, verification maturity ladder, quarterly trend reporting)
  3. Illinois case application (Project Cardinal Yorkville, Meta DeKalb and other projects)
  4. Discussion and limitations
  5. Conclusion

Related standards

  • ISO/IEC 30134-2
  • ISO/IEC 30134-6
  • ISO/IEC 30134-8
  • ISO/IEC 30134-9
  • EU Code of Conduct for Data Centres

Read the document

beyond-pue-local-impact-audit-2026.pdf

PDF · 0.5 MB · English

CC BY 4.0 — share with attribution

The document is provided unaltered because its licence permits redistribution.

Publication details

Authors
Sharifa Sultana; Syed Ishtiaque Ahmed
Publisher
arXiv preprint (cs.CY; formatted for ACM e-Energy '26)
Year
2026
Document number
arXiv:2609.23421
Document language
English
Source type
Scientific
Access
Open licence — downloadable
Licence
CC BY 4.0 — share with attribution
Licence evidence
arxiv.org
Original licence note

arXiv OAI-PMH record for 2609.23421 gives license http://creativecommons.org/licenses/by/4.0/.

Citation

Sharifa Sultana; Syed Ishtiaque Ahmed (2026). Beyond PUE: A Local-Impact Audit Framework for Data Center Environmental Accountability. arXiv preprint (cs.CY; formatted for ACM e-Energy '26). arXiv:2609.23421. https://doi.org/10.48550/arXiv.2609.23421

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.