Technical guideFree to read2024

The Benefits of Implementing Substations for Data Centers

Data Center Frontier (Black & Veatch contributed article) · Katie Muer

A Black & Veatch article on the schedule, cost and reliability benefits of data centre owners building and operating their own high-voltage substations where allowed.

On this page

Overview

This 2024 Black & Veatch contributed article by Katie Muer, published in Data Center Frontier, addresses data centre owners building and operating their own high-voltage substations where utilities and regulators allow it. It explains how self-build can shorten schedules and control cost when utilities are capacity- or capital-constrained.

The main schedule drivers are listed in the article: the utility interconnection agreement, equipment procurement, permits and site development. Some high-voltage equipment has 1-3 year procurement lead times, so identifying long-lead items early is important.

The technical comparison is made at a high level. Gas-insulated substations can cost up to three times an air-insulated design but need about a third of the space. The configurations considered are radial, main-tie-main, ring bus, breaker-and-a-half and double-bus double-breaker.

Reliability requires planned-outage management and redundant assets with no single points of failure, and the article stresses planning operations and maintenance and redundancy from day one. As a limitation, this is a sponsored consultancy article and offers no detailed sizing or cost data.

Key points

  1. Some high-voltage equipment has 1-3 year procurement lead times.
  2. Gas-insulated substations can cost up to three times an air-insulated design but need about a third of the space.
  3. Configurations considered: radial, main-tie-main, ring bus, breaker-and-a-half and double-bus double-breaker.
  4. Schedule is driven mainly by utility interconnection agreement, equipment procurement, permits and site development.
  5. Reliability requires planned-outage management and redundant assets with no single points of failure.
  6. Self-build can shorten schedules when utilities are capacity- or capital-constrained.
  7. Operations and maintenance and redundancy should be planned from day one.

Using it in design

  • Offer a substation object with a configuration field (radial, main-tie-main, ring bus, breaker-and-a-half, double-bus double-breaker) and an insulation type field (AIS, GIS), with footprint and cost multipliers.
  • Flag long-lead high-voltage equipment in the schedule output.
  • Weigh the GIS versus AIS space and cost trade-off together with site selection.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical designers of large high-voltage-fed data centres and owners planning grid connections.

Related standards

  • IEEE C37 series

Publication details

Authors
Katie Muer
Publisher
Data Center Frontier (Black & Veatch contributed article)
Year
2024
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Katie Muer (2024). The Benefits of Implementing Substations for Data Centers. Data Center Frontier (Black & Veatch contributed article). https://www.datacenterfrontier.com/sponsored/article/55180172/black-veatch-the-benefits-of-implementing-substations-for-data-centers

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.