The Benefits of Implementing Substations for Data Centers
Data Center Frontier (Black & Veatch contributed article) · Katie Muer
A Black & Veatch article on the schedule, cost and reliability benefits of data centre owners building and operating their own high-voltage substations where allowed.
On this page
Overview
This 2024 Black & Veatch contributed article by Katie Muer, published in Data Center Frontier, addresses data centre owners building and operating their own high-voltage substations where utilities and regulators allow it. It explains how self-build can shorten schedules and control cost when utilities are capacity- or capital-constrained.
The main schedule drivers are listed in the article: the utility interconnection agreement, equipment procurement, permits and site development. Some high-voltage equipment has 1-3 year procurement lead times, so identifying long-lead items early is important.
The technical comparison is made at a high level. Gas-insulated substations can cost up to three times an air-insulated design but need about a third of the space. The configurations considered are radial, main-tie-main, ring bus, breaker-and-a-half and double-bus double-breaker.
Reliability requires planned-outage management and redundant assets with no single points of failure, and the article stresses planning operations and maintenance and redundancy from day one. As a limitation, this is a sponsored consultancy article and offers no detailed sizing or cost data.
Key points
- Some high-voltage equipment has 1-3 year procurement lead times.
- Gas-insulated substations can cost up to three times an air-insulated design but need about a third of the space.
- Configurations considered: radial, main-tie-main, ring bus, breaker-and-a-half and double-bus double-breaker.
- Schedule is driven mainly by utility interconnection agreement, equipment procurement, permits and site development.
- Reliability requires planned-outage management and redundant assets with no single points of failure.
- Self-build can shorten schedules when utilities are capacity- or capital-constrained.
- Operations and maintenance and redundancy should be planned from day one.
Using it in design
- Offer a substation object with a configuration field (radial, main-tie-main, ring bus, breaker-and-a-half, double-bus double-breaker) and an insulation type field (AIS, GIS), with footprint and cost multipliers.
- Flag long-lead high-voltage equipment in the schedule output.
- Weigh the GIS versus AIS space and cost trade-off together with site selection.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers of large high-voltage-fed data centres and owners planning grid connections.
Related standards
- IEEE C37 series
Publication details
- Authors
- Katie Muer
- Publisher
- Data Center Frontier (Black & Veatch contributed article)
- Year
- 2024
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Katie Muer (2024). The Benefits of Implementing Substations for Data Centers. Data Center Frontier (Black & Veatch contributed article). https://www.datacenterfrontier.com/sponsored/article/55180172/black-veatch-the-benefits-of-implementing-substations-for-data-centers
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.