Research paperPDF2025

Enhancing Grid Resilience for Giga-Watt Scale Data Centers Using High Voltage Circuit Breaker Operated Braking Resistors

arXiv preprint (Black & Veatch / University of Central Missouri) · Soham Ghosh, Mohammad Ashraf Hossain Sadi

The work addresses the grid frequency and voltage rise that follows when hundreds of megawatts of voltage-sensitive IT load transfer to UPS during a transmission voltage dip, and proposes braking resistors switched by high-voltage circuit breakers at the data-centre transmission substation.

CC BY 4.0 — share with attribution

On this page

Overview

As hyperscale and co-located data centres scale, the grid sees large, voltage-sensitive IT loads with plant sizes ranging from 500 MW to 2 GW. A sudden loss of these loads as they switch to on-site UPS during a grid voltage excursion causes a grid frequency rise from generation and load imbalance, and a voltage rise because less power is flowing through the network. In the July 2024 incident about 1,500 MW of voltage-sensitive demand disconnected after six voltage depressions from automatic reclosing on a 230 kV line; frequency peaked at 60.047 Hz and voltage reached 1.07 pu before shunt capacitors were withdrawn.

The proposed remedy is braking resistors switched by high-voltage circuit breakers at the data-centre transmission substation, temporarily absorbing the lost load so that the imbalance is staggered in time. Simulations on a test bed with a gigawatt-scale data-centre cluster on a 345 kV network, for different synchronous/inverter-based generation mixes, show that brief resistor insertion limits the rate of change of frequency while governor response and capacitor switching act. Resistor insertion for 0.25-0.85 seconds sufficiently reduced rate of change of frequency and gave time for primary governor response and capacitor switching.

Illustrative scenario: five 200 MW data centres with a 1:1 IT to non-IT split give a maximum load drop of 500 MW at the substation when ANSI 27/59 relays transfer IT loads to UPS. For a 500 MW IT-load loss the largest single-stage braking resistor tested was 250 MW (half the IT load); in the IBR-rich case a 370 MW multi-stage bank (130, 130 and 110 MW) reduced the maximum step change from 250 MW to 130 MW. A precedent cited is the Bonneville Power Administration 1400 MW braking resistor at Chief Joseph substation.

The finding is that multi-stage braking resistors are more effective than a single stage in inverter-rich systems. Limits: it is a conceptual application; the authors list thermal adequacy, cycling, stress testing in regions where IBRs operate in grid-following mode and other items as future work. It is a preprint.

Key points

  1. Data-centre plant sizes are cited as ranging between 500 MW and 2 GW.
  2. Resistor insertion for 0.25-0.85 seconds sufficiently reduced rate of change of frequency and gave time for primary governor response and capacitor switching.
  3. In the July 2024 incident about 1,500 MW of voltage-sensitive demand disconnected after six voltage depressions from automatic reclosing on a 230 kV line; frequency peaked at 60.047 Hz and voltage reached 1.07 pu.
  4. Illustrative scenario: five 200 MW data centres with a 1:1 IT to non-IT split give a maximum load drop of 500 MW at the substation when ANSI 27/59 relays transfer IT loads to UPS.
  5. For a 500 MW IT-load loss the largest single-stage braking resistor tested was 250 MW; in the IBR-rich case a 370 MW multi-stage bank (130, 130 and 110 MW) reduced the maximum step change from 250 MW to 130 MW.
  6. Precedent cited: the Bonneville Power Administration 1400 MW braking resistor at Chief Joseph substation.

Using it in design

  • In gigawatt-scale data-centre interconnection studies, add the load-loss scenario from IT load transferring to UPS in a voltage dip (for example 5 × 200 MW with a 1:1 split giving 500 MW) to the grid frequency and voltage analysis.
  • In inverter-rich grids evaluate multi-stage braking resistor banks (such as 130/130/110 MW) against a single stage; insertion time was in the 0.25-0.85 s range.
  • Coordinate ANSI 27/59 relay settings and UPS transfer thresholds with grid resilience at the point of connection.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Grid engineers and data-centre designers planning gigawatt-scale data-centre interconnection and grid resilience.

Document contents

  1. I. Introduction (A. Research motivation, B. Manuscript contribution)
  2. II. Non-Voltage Sensitive Load Ride Through
  3. III. Test Bed System Description
  4. IV. Simulation Results and Discussion (A. Single machine system with single-stage resistive braking, B. Multi-machine system with single-stage resistive braking, C. IBR rich system with multi-stage resistive braking, D. System stability evaluation through eigenvalue trajectories, E. Investigating risk of motor stalling due to grid induced events)
  5. V. Conclusion and Future Work

Read the document

gw-dc-hv-breaker-braking-2025.pdf

PDF · 0.5 MB · English

CC BY 4.0 — share with attribution

The document is provided unaltered because its licence permits redistribution.

Publication details

Authors
Soham Ghosh; Mohammad Ashraf Hossain Sadi
Publisher
arXiv preprint (Black & Veatch / University of Central Missouri)
Year
2025
Document number
arXiv:2512.21295
Document language
English
Source type
Scientific
Access
Open licence — downloadable
Licence
CC BY 4.0 — share with attribution
Licence evidence
arxiv.org
Original licence note

arXiv record licence is http://creativecommons.org/licenses/by/4.0/ (checked via arXiv OAI-PMH)

Citation

Soham Ghosh; Mohammad Ashraf Hossain Sadi (2025). Enhancing Grid Resilience for Giga-Watt Scale Data Centers Using High Voltage Circuit Breaker Operated Braking Resistors. arXiv preprint (Black & Veatch / University of Central Missouri). arXiv:2512.21295. https://doi.org/10.48550/arXiv.2512.21295

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.