Best Practices for Large Load Interconnections: A North American Perspective on Data Centers

CIGRE US National Committee, 2025 Grid of the Future Symposium (arXiv preprint) · Rafi Zahedi, Amin Zamani et al.

A review of published large-load interconnection guidance from AEP, Dominion, ERCOT, Ameren (MISO), PG&E, Southern Company and SPP, organised into eight categories: load management, power quality, voltage and frequency ride-through, post-disturbance recovery, protection, communications/control, and study/modelling.

CC0 1.0 — public domain dedication; free to reuse

On this page

Overview

Large loads are expanding rapidly across North America, led by data centres, cryptocurrency mining, hydrogen production facilities and heavy-duty charging stations. Data centres draw particular attention as AI deployment drives unprecedented capacity growth; their scale, duty cycles and converter-dominated interfaces introduce new challenges for transmission interconnections regarding disturbance behaviour, steady-state performance and operational visibility. In July 2024 a 230 kV fault in the Eastern Interconnection tripped 1,500 MW of data-centre load; between late 2023 and early 2025 ERCOT and the Eastern Interconnection recorded 25 crypto-mining load losses of 100-400 MW each.

The authors extract explicit numeric limits at the point of interconnection and compare them. Large-load thresholds differ: Dominion ≥50 MW for power-electronic loads, ERCOT ≥75 MW per site with a 25 MW substation visibility threshold, Southern ≥50 MW above 40 kV, SPP >10 MW at 69 kV or >50 MW at higher voltage. Southern Company is the only entity in this review with a numeric ramp cap, ≤20 MW/min under normal operation. Power quality: Dominion ≤3% instantaneous voltage fluctuation at the POI; Ameren uses IEEE 519 and IEEE 1453; PG&E Rule 2 limits THD ≤5% and ~10% imbalance.

SPP's VRT curve is 0.90-1.10 pu continuous with short-duration tolerance down to ~0.50 pu for ~0.15 s; Dominion requires ride-through of several reclosing shots of ~50-70 ms with undervoltage pickup near 85%. SPP FRT example: continuous 58.8-61.2 Hz, extended tolerance for 299 s outside that band, trip permissible above ~61.8 Hz or below ~57.0 Hz. ERCOT is the only entity with a numeric recovery target: ≥90% of pre-disturbance load restored within 1 second once V_POI ≥ 0.9 pu (proposal). Only SPP and ERCOT publish explicit POI-based VRT envelopes; load FRT is mostly tied to UFLS schemes.

The finding is that protection and power-quality rules are fairly mature and converge on IEEE 519/1453, whereas ride-through envelopes, ramp limits, recovery targets and even the definition of a 'large load' vary widely; the authors argue for harmonised VRT/FRT envelopes and telemetry similar to European practice. Limits: a review of seven entities' published guidance; rules are evolving fast, and it is a preprint.

Key points

  1. In July 2024 a 230 kV fault in the Eastern Interconnection tripped 1,500 MW of data-centre load; between late 2023 and early 2025 ERCOT and the Eastern Interconnection recorded 25 crypto-mining load losses of 100-400 MW each.
  2. Large-load thresholds differ: Dominion ≥50 MW for power-electronic loads, ERCOT ≥75 MW per site (25 MW substation visibility threshold), Southern ≥50 MW above 40 kV, SPP >10 MW at 69 kV or >50 MW at higher voltage.
  3. Southern Company is the only entity in this review with a numeric ramp cap: ≤20 MW/min under normal operation.
  4. Power quality: Dominion ≤3% instantaneous voltage fluctuation at the POI; Ameren IEEE 519 and IEEE 1453; PG&E Rule 2 THD ≤5% and ~10% imbalance.
  5. SPP's VRT curve: 0.90-1.10 pu continuous with short-duration tolerance down to ~0.50 pu for ~0.15 s; Dominion requires ride-through of several reclosing shots of ~50-70 ms with undervoltage pickup near 85%.
  6. SPP FRT example: continuous 58.8-61.2 Hz, extended tolerance for 299 s outside that band, trip permissible above ~61.8 Hz or below ~57.0 Hz.
  7. ERCOT is the only entity with a numeric recovery target: ≥90% of pre-disturbance load restored within 1 second once V_POI ≥ 0.9 pu (proposal).
  8. Only SPP and ERCOT publish explicit POI-based VRT envelopes; load FRT is mostly tied to UFLS schemes.

Using it in design

  • In a large-load interconnection application, verify the relevant entity's large-load threshold (10-75 MW) and ramp limit (Southern ≤20 MW/min) early; definitions differ widely between entities.
  • Check data-centre ride-through design against the VRT envelopes at the point of connection (SPP: 0.90-1.10 pu continuous, ~0.50 pu for ~0.15 s; Dominion: several ~50-70 ms reclosing shots) and FRT bands.
  • Design for power quality at the point of connection to IEEE 519 and IEEE 1453, and plan permanent power-quality metering and telemetry.
  • Add the target ERCOT proposes for post-disturbance recovery (≥90% within 1 second) to UPS and load-reconnection logic.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Grid engineers and designers preparing large data-centre load interconnection applications and comparing entities' technical requirements.

Document contents

  1. 1. Introduction
  2. 2. USA Large Load Technical Interconnection Requirements
  3. 3. European Experience and Vision
  4. 4. Conclusion

Related standards

  • IEEE 519
  • IEEE 1453
  • IEEE 2800-2022
  • IEEE 1668-2017
  • NERC PRC-029-1
  • ITI (CBEMA) curve

Read the document

large-load-interconnection-best-practices-2026.pdf

PDF · 0.5 MB · English

CC0 1.0 — public domain dedication; free to reuse

The document is provided unaltered because its licence permits redistribution.

Publication details

Authors
Rafi Zahedi; Amin Zamani; Rahul Anilkumar
Publisher
CIGRE US National Committee, 2025 Grid of the Future Symposium (arXiv preprint)
Year
2025
Document number
arXiv:2601.12686
Document language
English
Source type
Scientific
Access
Open licence — downloadable
Licence
CC0 1.0 — public domain dedication; free to reuse
Licence evidence
arxiv.org
Original licence note

arXiv record licence is http://creativecommons.org/publicdomain/zero/1.0/ (CC0, checked via arXiv OAI-PMH)

Citation

Rafi Zahedi; Amin Zamani; Rahul Anilkumar (2025). Best Practices for Large Load Interconnections: A North American Perspective on Data Centers. CIGRE US National Committee, 2025 Grid of the Future Symposium (arXiv preprint). arXiv:2601.12686. https://doi.org/10.48550/arXiv.2601.12686

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.