Data Center Development Cost Guide 2026 (U.S.)
Cushman & Wakefield · John McWilliams, Adrian Conforti
Cushman & Wakefield's 2026 guide to all-in data center development costs in the US, reporting average greenfield cost per MW and the shift of the pipeline to secondary markets.
On this page
Overview
This document is Cushman & Wakefield's 2026 guide to all-in data center development costs in the United States, written by John McWilliams and Adrian Conforti. The summary page is public, but the full guide requires registration. This page rests only on the publicly available key takeaways and is for citation purposes only. This framework gives a reference point specific to the US market.
According to the key takeaways, the average greenfield cost for the most modern facilities is about $17.6 million per MW, varying by market and workload. Development costs are up 21% per MW since the previous report. The US pipeline is about $2.3 trillion: $492 billion under construction and $1.8 trillion planned or precommitted, and investment is shifting to secondary and frontier markets.
The guide also stresses two pressures on cost and schedule: shortages of skilled mechanical, electrical and plumbing (MEP) labour raise both cost and schedule, and powered land commands significantly higher prices than non-powered land. The figures are specific to the US market; they do not apply directly to Turkey or other markets and should be adapted with a market multiplier. These figures show that market choice, not only cost per MW, is decisive in investment decisions.
Key points
- Average greenfield cost about $17.6M per MW for the most modern facilities, varying by market and workload.
- Development costs up 21% per MW since the previous report.
- US pipeline about $2.3 trillion: $492B under construction, $1.8T planned/precommitted.
- Investment is shifting to secondary and frontier markets.
- MEP skilled-labour shortages raise cost and schedule.
- Powered land commands significantly higher prices than non-powered land.
Using it in design
- In the cost module, offer an all-in $/MW benchmark band with source and year and allow a market multiplier.
- Note that all-in (land + shell + MEP) differs from shell-and-core benchmarks (e.g., JLL).
- Show the powered-land premium as a separate line in site selection and feasibility scenarios.
- Add MEP labour scarcity to the schedule and cost risk items.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Developers, investors and teams doing feasibility and budget work, and those building a cost module.
Publication details
- Authors
- John McWilliams; Adrian Conforti
- Publisher
- Cushman & Wakefield
- Year
- 2026
- Document language
- English
- Source type
- Expert / community
- Access
- Citation only
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note
Summary page public; guide gated; cited only.
Citation
John McWilliams; Adrian Conforti (2026). Data Center Development Cost Guide 2026 (U.S.). Cushman & Wakefield. https://www.cushmanwakefield.com/en/united-states/insights/data-center-development-cost-guide