Data Centers for Utilities (ENERGY STAR)

U.S. Environmental Protection Agency (ENERGY STAR) · U.S. Environmental Protection Agency

An ENERGY STAR page for utility programme managers explaining why data centres are attractive efficiency-programme targets and the barriers programmes must address.

On this page

Overview

This page was prepared by the US Environmental Protection Agency's ENERGY STAR programme for utility efficiency-programme managers. It explains why data centres are attractive targets for efficiency programmes and which barriers programmes must address. The page also links the ENERGY STAR 5 and 16 ways resources and the LBNL Data Center Metering guide. The page aims to offer a general frame for designing programmes and points to two resources for that purpose.

The rationale rests on intense electricity use: per square foot, data centres can use up to 50 times the electricity of standard office space, based on Portfolio Manager data. A cited 2019 report states that an efficient data centre can use up to 80% less power than an inefficient one. Together these two figures form the core rationale for why efficiency programmes target data centres.

Among the barriers is risk aversion: a cited 2016 study put data centre downtime cost at $9,000 per minute, which drives risk-averse over-redundancy. The second is split incentives between IT decision-makers and energy-bill owners, which the page names as a key programme barrier. The page is a freely accessible ENERGY STAR resource, and only the record's summary and key facts were used here. Some of its figures rest on external reports it cites and are set in a US context.

Key points

  1. Per square foot, data centres can use up to 50 times the electricity of standard office space (Portfolio Manager data).
  2. A cited 2019 report states an efficient data centre can use up to 80% less power than an inefficient one.
  3. A cited 2016 study put downtime cost at $9,000 per minute, driving risk-averse over-redundancy.
  4. Split incentives between IT decision-makers and energy-bill owners are a key programme barrier.
  5. The page links to the ENERGY STAR ways resources and the LBNL Data Center Metering guide.

Using it in design

  • In the cost model, attach utility incentive data (rebates) to measures such as efficient UPS, containment and economizers.
  • Use the 50x office intensity figure as context in early-stage load estimates.
  • In redundancy decisions, note as a risk remark how downtime cost can encourage over-redundancy.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Utility programme managers and designers assessing data centre energy cost and incentive opportunities.

Related standards

  • LBNL Data Center Metering and Resource Guide

Publication details

Authors
U.S. Environmental Protection Agency
Publisher
U.S. Environmental Protection Agency (ENERGY STAR)
Year
2026
Document language
English
Source type
Government / public
Access
Free to read
Licence
U.S. public domain — U.S. Government work; free to reuse
Original licence note

EPA ENERGY STAR web page (U.S. government work); no publication date shown, year = date accessed (2026-11-13); recorded as a citation because the page was not archived as a file.

Citation

U.S. Environmental Protection Agency (2026). Data Centers for Utilities (ENERGY STAR). U.S. Environmental Protection Agency (ENERGY STAR). https://www.energystar.gov/products/data_center_equipment/utilities

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.