Technical guideFree to read2013

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers (FEMP case study, September 2013)

U.S. DOE Federal Energy Management Program / Lawrence Berkeley National Laboratory · Rod Mahdavi

An LBNL case study of energy assessments at DoD high-performance computing data centres, grouping measures into packages with typical cost per kW of IT and simple payback.

On this page

Overview

This document is a September 2013 case study prepared by Lawrence Berkeley National Laboratory (LBNL) for the US Department of Energy's Federal Energy Management Program (FEMP); the author is Rod Mahdavi. It is based on energy assessments at DoD high-performance computing data centres, jointly funded by the DoD and FEMP.

The method is to group the recommended measures into packages: air management, cooling retrofit, generator block-heater modification, lighting and chilled-water plant. For each package, a typical cost per kW of IT load and a simple payback are given. This presentation lets a facility pick the package closest to its own situation and quickly estimate the size and return of the investment.

The results are striking: estimated total savings exceeded 8,000 MWh per year with about 7,500 tons per year of greenhouse gas reduction, and measures averaged under two years payback. The air management adjustment package typically costs about $100 per kW of IT and pays back in about a year. Other packages range from $10 to $400 per kW of IT with 2.5-3 year paybacks, including a generator block-heater modification. For context, rack power at the sites averaged up to 10-25 kW, and sites commonly used 480 V power without intervening transformation. The findings are therefore most meaningful for high-density computing environments; when applied to enterprise facilities or other regions, costs should be updated, since the figures reflect 2013 US conditions.

Key points

  1. Estimated total savings exceeded 8,000 MWh/yr with about 7,500 tons/yr GHG reduction.
  2. Measures averaged under two years payback.
  3. Rack power averaged up to 10-25 kW; sites commonly used 480 V power without intervening transformation.
  4. Air management adjustment package: about $100/kW of IT, about 1 year payback.
  5. Other packages range from $10/kW to $400/kW of IT with 2.5-3 year paybacks.
  6. A generator block-heater modification is one of the packages.
  7. Packages: air management, cooling retrofit, block heater, lighting, chilled-water plant.

Using it in design

  • Use the package cost/kW and payback ranges as defaults in the retrofit measure library (air management, generator block heater controls, chilled-water plant).
  • Show generator block-heater energy as a standby load in the electrical model.
  • Rank air management as the shortest-payback step ahead of larger cooling investments.
  • When using the costs, note in the report that the source is 2013 US data.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Engineers and facility managers prioritising energy-efficiency retrofits in existing data centers.

Publication details

Authors
Rod Mahdavi
Publisher
U.S. DOE Federal Energy Management Program / Lawrence Berkeley National Laboratory
Year
2013
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Prepared for DOE FEMP by a national-laboratory contractor (stated on cover); not US-Gov public domain. Cited only.

Citation

Rod Mahdavi (2013). Energy Efficiency Opportunities in Federal High Performance Computing Data Centers (FEMP case study, September 2013). U.S. DOE Federal Energy Management Program / Lawrence Berkeley National Laboratory. https://www.energy.gov/cmei/femp/articles/energy-efficiency-opportunities-federal-high-performance-computing-data-centers

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.