According to the paper, PUE of global large data centres stayed around 1.6 for seven years (Uptime 2021), while Chinese policy targets new large data centres below 1.3 by 2025. The authors therefore advise looking beyond PUE to CUE, WUE and other xUE metrics, heat reuse and recyclability.
On speed and space, prefabricated modular build can cut a 1000-rack data centre from more than 18 months to 6-9 months. In one cited project the PowerPOD reference saves more than 40 % of power-system space, allowing 350 more IT racks and more than 16,000 m less power cable. Above about 20 kW per rack, liquid cooling is expected to become the primary method with air as auxiliary (converged air-liquid cooling).
The operations and reliability section rests on automation. A 1000-rack data centre typically needs 15-30 O&M engineers doing 6-12 on-site inspections, while infrared and robotic inspection covers 2000 racks remotely in 5 minutes. AI energy optimisation at Huawei Cloud Langfang (700+ points) cut annual PUE from 1.42 to 1.25, saving 33.36 GWh. Per Uptime 2021, power and cooling failures account for 57 % of outages (43 % power, 14 % cooling).
Key points
- PUE of large DCs stayed around 1.6 for seven years (Uptime 2021); Chinese policy targets new large DCs below 1.3 by 2025.
- Prefabricated modular build cuts a 1000-rack DC from more than 18 months to 6-9 months.
- PowerPOD reference saved >40 % of power-system space: 350 more IT racks and >16,000 m less power cable.
- Above about 20 kW per rack liquid cooling becomes primary, with air as auxiliary.
- A 1000-rack DC needs 15-30 O&M engineers and 6-12 on-site inspections; robotic inspection covers 2000 racks in 5 minutes.
- Huawei Cloud Langfang AI optimisation cut annual PUE from 1.42 to 1.25, saving 33.36 GWh.
- Uptime 2021: 57 % of outages come from power and cooling (43 % power, 14 % cooling).
Using it in design
- Support CUE, WUE and a heat-reuse fraction next to PUE in reports.
- In the cooling advisor, suggest liquid cooling above about 20 kW per rack.
- In ops planning, estimate O&M headcount from rack count and automation level.
- In reliability checks, weight power-chain design heavily, since power causes the largest outage share.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Facility investors and designers planning metrics, operations and fast deployment together.
Related standards
- GB 50174-2017
- The Green Grid xUE metrics
Publication details
- Authors
- Huawei Digital Power
- Publisher
- Huawei Digital Power
- Year
- 2022
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Huawei Digital Power (2022). Next-Generation Data Center Facility White Paper. Huawei Digital Power. https://digitalpower.huawei.com/attachments/index/1c651408309b41c78e368a270f89d89e.pdf
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.