White Paper on the Top 10 Trends of Data Center Facilities
Huawei Digital Power
Huawei's 2023 outlook names ten facility trends: low carbon, sustainability, fast deployment, high density, elasticity, prefabrication, storage-backup integration, distributed cooling, smart O&M and security. It is a strategic reference rather than a design guide, but it supplies target metrics and density projections.
On this page
Overview
Each trend comes with policy context, mostly Chinese and European targets, and Huawei project examples. Average large-DC PUE is about 1.55 (Uptime 2022) with most new builds at 1.25-1.3, and Huawei projects PUE 1.0x by 2027. Chinese hub targets are PUE below 1.2 in West China and below 1.25 in East China; WUE targets are below 1.4 L/kWh in water-rich and below 0.8 L/kWh in water-scarce regions.
On density, rack power is expected to rise from 6-8 kW to 12-15 kW within five years. When rack density reaches 16 kW, the power-room area roughly equals the IT space (1:1). Cold-plate liquid cooling is cited at PUE about 1.1x and immersion as low as 1.0x; a 4000-rack Irish data centre with indirect evaporative cooling reaches PUE 1.15.
The lifecycle argument is that IT equipment lives 4-5 years while power and cooling last 10-15 years, so a facility must serve 2-3 IT generations. Prefabrication cuts target delivery for a roughly 1000-rack data centre from 9-12 months to about 6 months. On reliability, Uptime 2022 attributes 13 % of outages to cooling.
Key points
- Average large-DC PUE about 1.55 (Uptime 2022); most new builds 1.25-1.3; Huawei projects 1.0x by 2027.
- Chinese hub targets: PUE <1.2 West and <1.25 East; WUE <1.4 L/kWh water-rich, <0.8 L/kWh water-scarce.
- At 16 kW per rack, power-room area roughly equals IT space (1:1).
- Rack density expected to rise from 6-8 kW to 12-15 kW within five years.
- Cold-plate liquid cooling about PUE 1.1x; immersion as low as 1.0x.
- IT lives 4-5 years, power and cooling 10-15; facilities serve 2-3 IT generations.
- Delivery of a ~1000-rack DC cut from 9-12 months to about 6 via prefabrication.
- Uptime 2022: cooling causes 13 % of outages; 4000-rack Irish DC with indirect evaporative cooling reaches PUE 1.15.
Using it in design
- Show WUE alongside PUE in the metrics panel, with region-specific targets as policy presets.
- Warn in the space planner when the power-room-to-white-space ratio approaches 1:1 at high density.
- Allow several IT refresh scenarios on one facility design (10-15 year plant, 4-5 year IT).
- Tag liquid-cooling designs with an expected PUE band for early estimates.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Decision makers and planning engineers translating policy targets and density trends into facility strategy.
Related standards
- The Green Grid PUE/WUE
Publication details
- Authors
- Huawei Digital Power
- Publisher
- Huawei Digital Power
- Year
- 2023
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Huawei Digital Power (2023). White Paper on the Top 10 Trends of Data Center Facilities. Huawei Digital Power. https://digitalpower.huawei.com/attachments/index/e8c4f4fd705a4d48ad229502e3eb668b.pdf
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.