This 2024 Vertiv paper assesses chilled-water cooling with TEWI and WUE and quantifies each efficiency step with a 15 MW simulation in three cities.
On this page
Overview
Cooling accounts for roughly 25-35% of data-centre energy in many facilities. The paper uses TEWI as its yardstick: direct refrigerant-leak emissions plus indirect electricity emissions. The formula is GWP x leakage rate x years, plus GWP x charge x (1 - recovery factor), plus years x annual energy x grid CO2 factor. For scroll chillers, R410A (GWP 1924) gives way to R454B (466), R32 (677) or R290; for screw and centrifugal chillers, R134a (1300) to R513A (573) or R1234ze (below 1).
Efficiency steps are shown in sequence: typical white space now runs at 24-25°C server inlet with 36-37°C return air, with chilled water raised from 10-15°C to 15-18°C or higher; then come free-cooling chillers, plant-level control, inverter compressors, adiabatic pads, heat recovery and thermal storage. The simulation basis is, per 5 MW hall, 5 (N+1) chillers of 1250 kW and 28 (N+1) CRAHs of 185 kW, at 80% load (12 MW total).
The results make each step concrete. Ashburn pPUE goes from a 10/15°C baseline of 1.217 to 1.128 with 20/28°C water and free-cooling chillers, 1.117 with plant control, 1.106 with inverter compressors and low-GWP refrigerant and 1.094 with adiabatic, while WUE rises from 0 to 0.277 L/kWh. In Tokyo the baseline of 1.235 falls to 1.108 with adiabatic (WUE 0.253 L/kWh). The paper also notes that 2-5 MW halls are moving to non-raised floors, where standard perimeter CRAHs can create high-velocity air and negative pressure at the first rack row.
Key points
- Cooling accounts for roughly 25-35% of data-centre energy in many facilities.
- TEWI = GWP x leakage rate x years + GWP x charge x (1 - recovery factor) + years x annual energy x grid CO2 factor.
- Refrigerant swaps: R410A (GWP 1924) to R454B (466), R32 (677) or R290 for scroll chillers; R134a (1300) to R513A (573) or R1234ze (<1) for screw/centrifugal.
- Typical white space now runs at 24-25°C server inlet with 36-37°C return air; chilled water is raised from 10-15°C to 15-18°C or higher.
- Simulation basis per 5 MW hall: 5 (N+1) chillers of 1250 kW and 28 (N+1) CRAHs of 185 kW at 80% load (12 MW total).
- Ashburn pPUE: baseline 10/15°C 1.217; 20/28°C water with free-cooling chillers 1.128; plant control 1.117; inverter compressor + low-GWP 1.106; adiabatic 1.094 (WUE 0 to 0.277 L/kWh).
- Tokyo equivalent: 1.235 baseline down to 1.108 with adiabatic (WUE 0.253 L/kWh).
- 2-5 MW halls are moving to non-raised floor; standard perimeter CRAHs can create high-velocity air and negative pressure at the first rack row.
Using it in design
- Add a TEWI calculation to cooling options (refrigerant GWP, charge kg, leak rate, life years, grid emission factor).
- Give the chiller catalogue refrigerant, GWP (AR5), free-cooling capability, adiabatic option and compressor type, and flag high-GWP refrigerants against F-gas and Kigali phase-down.
- Report pPUE and WUE together so adiabatic gains are never shown without their water cost.
- Warn on non-raised-floor halls with standard perimeter CRAHs near the first row.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Check cooling capacity alongside your design
Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.
Request a demo
Who should read it
Mechanical designers evaluating chilled-water plant architecture, refrigerant choice and adiabatic options.
Related standards
- ASHRAE TC 9.9 Thermal Guidelines
- EU F-gas Regulation
- ISO/IEC 30134-9 (WUE)
- ISO/IEC 30134-2 (PUE)
Publication details
- Authors
- Vertiv
- Publisher
- Vertiv
- Year
- 2024
- Document number
- SL-18066
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Vertiv (2024). How Chilled Water Systems Meet Data Center Availability and Sustainability Goals. Vertiv. SL-18066. https://www.vertiv.com/4a24eb/globalassets/shared/vertiv-chilled-water-solution-white-paper-sl-18066.pdf
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.