White paperFree to read2022

Data Center PowerPOD 3.0 Technology White Paper

Huawei Digital Power

Describes Huawei's PowerPOD 3.0 power train, which combines transformer, LV switchgear, modular UPS and feeder cabinets in one prefabricated lineup. It includes a comparison with a conventional multi-vendor power room on footprint, deployment time, efficiency and 10-year TCO.

On this page

Overview

The document defines a skid-mountable lineup for 2N data-centre power. The 2.5 MW PowerPOD measures 2475 x 9600 x 1500 mm with a 2500 kVA transformer and 4 x 600 kVA UPS; the 2.0 MW variant uses 2000 kVA and 4 x 500 kVA. The motivation is that average rack power rose from 4 kW to 6-8 kW and is heading to 12-16 kW, which enlarges the power room's share of floor area.

On protection, IEC 60364-4-43 requires a protective device within 3 m on an unprotected branch, and PowerPOD 3.0 keeps branch S2 at 3 m or less using fused 100 kVA UPS modules. S-ECO mode reaches efficiency above 98.5 % at 25 % load and 99 % at 50 % load with 0 ms transfer, meeting IEC 62040-3 Class 1; in bypass the input PF is above 0.99 and THDi below 3 %.

Installation needs 2300 mm of front and 1000 mm of rear clearance (2100/800 mm if space-limited), and the floor must carry at least 1.8 t/m2. Commissioning runs transformer, incoming/bus-tie cabinet, maintenance bypass cabinet, feeder cabinet. The cabinet count for 2.5 MW falls from 22 to 11 (40 % less footprint); in a 1500-rack, 8 kW/rack 2N site this frees 510 m2, about 170 extra racks. Link efficiency is 94.5 % to 95.6 % for double conversion and 97.8 % for S-ECO; for 12 MW at 50 % load and USD 0.11/kWh the 10-year saving is about USD 0.96 M (double conversion) or about USD 1.9 M (S-ECO).

Key points

  1. Average rack power rose from 4 kW to 6-8 kW and is heading to 12-16 kW.
  2. IEC 60364-4-43: protective device within 3 m on an unprotected branch; PowerPOD 3.0 keeps S2 at 3 m or less with fused 100 kVA UPS modules.
  3. S-ECO: above 98.5 % at 25 % load, 99 % at 50 % load, 0 ms transfer, IEC 62040-3 Class 1.
  4. 2.5 MW PowerPOD: 2475 x 9600 x 1500 mm, 2500 kVA transformer, 4 x 600 kVA UPS; 2.0 MW: 2000 kVA and 4 x 500 kVA.
  5. Clearances 2300 mm front, 1000 mm rear (2100/800 mm if limited); floor at least 1.8 t/m2.
  6. Cabinets for 2.5 MW cut from 22 to 11, 40 % less footprint; 510 m2 and about 170 extra racks in a 1500-rack site.
  7. Link efficiency: double conversion 94.5-95.6 %, S-ECO 97.8 %; 10-year saving about USD 0.96 M or USD 1.9 M.
  8. Commissioning order: transformer, incoming/bus-tie, maintenance bypass, feeder cabinet.

Using it in design

  • Add a 'prefabricated power train' block type (transformer, LV, UPS, feeders) carrying footprint, weight and a clearance envelope.
  • Enforce front, rear and side clearances and the 1.8 t/m2 floor loading.
  • Check unprotected branch lengths in single-line diagrams against the 3 m limit of IEC 60364-4-43.
  • Catalogue UPS eco modes with efficiency at 25 % and 50 % load and the transfer class.
  • Provide a TCO comparison template for an integrated versus a stick-built power room.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical designers and project managers weighing a prefabricated power train against a conventional power room.

Related standards

  • IEC 60364-4-43
  • IEC 62040-3
  • IEC 61439

Publication details

Authors
Huawei Digital Power
Publisher
Huawei Digital Power
Year
2022
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Huawei Digital Power (2022). Data Center PowerPOD 3.0 Technology White Paper. Huawei Digital Power. https://digitalpower.huawei.com/attachments/index/e337dc014eb54d378c1e46beaf2e72cc.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.