Guidance for Calculation of Efficiency (PUE) in Data Centers
Schneider Electric · Victor Avelar
Schneider Electric WP 158 explains why published PUE values are often not comparable and proposes one table that classifies every subsystem as IT load, infrastructure or excluded.
On this page
Overview
PUE is total data center input power divided by IT load power, with 1.0 as the ideal. According to the paper the problem is not the formula but which device lands in the numerator or denominator. The author classifies subsystems across power, cooling and other groups (lighting, NOC, personnel space) in tables, so two facilities are measured within the same boundary.
On the power side, UPS, PDUs/transformers, switchgear, ATS and generator ancillaries (block and jacket-water heaters, battery chargers, controls) count as infrastructure and are included. In cooling, chillers, cooling towers (fans, basin heaters), pumps, CRAC/CRAH units, humidifiers and unit heaters in M&E rooms are infrastructure. Lighting serving the data center is included; NOC and personnel spaces are a judgment call, with the NOC included only when dedicated to the data center.
Practical difficulties get methods. Switchgear and ATS losses, about 1% of total energy, are commonly omitted and should be estimated instead. Shared subsystems, such as a chiller plant that also serves offices, must not be excluded but apportioned by a standardized estimation method. The conclusion is that PUE can be computed without expensive instrumentation; estimation is acceptable if losses are estimated systematically, omission is not. The paper dates from 2015 and should be read alongside ISO/IEC 30134-2 and EN 50600-4-2.
Key points
- PUE = total data center input power / IT load power; ideal 1.0.
- UPS, PDUs/transformers, switchgear, ATS and generator ancillaries (block/jacket-water heaters, battery chargers, controls) are infrastructure and included.
- Chillers, towers (fans, basin heaters), pumps, CRAC/CRAH, humidifiers and M&E-room unit heaters are infrastructure.
- Lighting serving the data center is included; the NOC is included only when dedicated to the data center.
- Switchgear/ATS losses (about 1% of total energy) are commonly omitted and should be estimated.
- Shared subsystems (a chiller plant also serving offices) are apportioned by a standard method, not excluded.
Using it in design
- Build the PUE calculator on an explicit load-classification table: each catalog component is IT, infrastructure, excluded or shared.
- Add switchgear/transformer losses at about 1% of facility energy when not modeled, and include generator block heaters and M&E-room heaters.
- For mixed-use sites ask for a shared_fraction on chiller plants and towers.
- Show which subsystems are inside PUE, provide a NOC toggle, and warn when an infrastructure component has no loss model.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Energy managers, operations teams and designers who report PUE or must compare PUE across two facilities.
Related standards
- ISO/IEC 30134-2
- EN 50600-4-2
- The Green Grid WP#49
Publication details
- Authors
- Victor Avelar
- Publisher
- Schneider Electric
- Year
- 2015
- Document number
- WP 158
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Victor Avelar (2015). Guidance for Calculation of Efficiency (PUE) in Data Centers. Schneider Electric. WP 158. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_SNIS-7E6LKL_EN
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.