White paperCitation2011

WP#42 - Deploying and Using Containerized Modular Data Center Facilities

The Green Grid · Christopher Kelley, Jud Cooley et al.

The Green Grid's 2011 white paper examines containerised and modular data centre facilities (CMDF) as pre-engineered, prefabricated building blocks.

On this page

Overview

WP#42 is a Green Grid white paper dated 15 November 2011, edited by Christopher Kelley (Cisco) and Jud Cooley (Oracle), with Ron Bednar, Buster Long and Suzen Shaw among the authors.

The white paper examines containerised and modular data centre facilities (CMDF). They are described as repeatable, pre-engineered, prefabricated and quality-assured building blocks. The approach means thinking of a data centre not as a single structure built on site but as a set of modules prepared in a factory and brought to the site.

The abstract lists the expected benefits: rapid deployment, lower operating and capital cost, and higher density. The paper also notes that multiple implementation approaches exist across suppliers, so CMDF is a category covering different architectures rather than a single product type. Limits: the paper dates from 2011 and its full text was not read, so capacity ranges, cost comparisons and implementation details are absent from this record. For designers its value is in supporting the treatment of prefabricated modules in design tools as catalogue items with fixed capacity, footprint and interfaces.

Key points

  1. Dated 15 November 2011; editors Christopher Kelley (Cisco) and Jud Cooley (Oracle).
  2. CMDF are repeatable, pre-engineered, prefabricated and quality-assured building blocks.
  3. Expected benefits: rapid deployment, lower operating and capital cost, higher density.
  4. Multiple implementation approaches exist across suppliers.
  5. The author group also includes Ron Bednar, Buster Long and Suzen Shaw.

Using it in design

  • Support prefabricated module objects (power skids, container halls) as catalogue items with fixed capacity, footprint and interfaces.
  • State supplier-specific implementation differences explicitly in the module definition.
  • Plan the need for rapid deployment together with site preparation work (ground, utility connection).
  • Verify cost and density claims against supplier data; this record only states expected benefits.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Designers, owners and procurement teams planning data centre capacity for rapid deployment.

Publication details

Authors
Christopher Kelley; Jud Cooley; Ron Bednar; Buster Long; Suzen Shaw
Publisher
The Green Grid
Year
2011
Document number
WP 42
Document language
English
Source type
Industry body
Access
Citation only
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Download requires a free TGG account sign-in and is governed by The Green Grid Terms of Use; summary and facts from the public library landing page; full text not redistributed.

Citation

Christopher Kelley; Jud Cooley; Ron Bednar; Buster Long; Suzen Shaw (2011). WP#42 - Deploying and Using Containerized Modular Data Center Facilities. The Green Grid. WP 42. https://www.thegreengrid.org/en/resources/library-and-tools/388-WP%23-42---Deploying-and-Using-Containerized-Modular-Data-Center-Facilities

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.