Data Center Cooling: CRAC/CRAH redundancy, capacity, and selection metrics (Hussein Shehata)

Uptime Institute Journal · Hussein Shehata

An Uptime Journal article that uses layout modelling of down-flow CRAC/CRAH units with raised floor to show the practical density limit of perimeter cooling and the space cost of redundancy.

On this page

Overview

Hussein Shehata's 2014 article in the Uptime Institute Journal uses layout modelling of down-flow CRAC/CRAH units with a raised floor to show the practical density limit of perimeter cooling and the space cost of redundancy. The article is freely readable and is an expert community piece. The example CRAC delivers about 90 kW net sensible in a 3 x 1 m footprint; layouts were modelled with 10, 14 and 18 m air throw and with units on one or two sides.

The author argues that passive hot-air-removal cabinets cannot remove more heat than the cold air supplied, debunking claims of 20 kW or more per cabinet. The model states its assumed clearances: 500 mm side and 1,000 mm long-side maintenance space, at least 2 m from the nearest cabinet to the CRAC, a 1,000 mm hot aisle and a 1,200 mm cold aisle. These assumptions show under which conditions the results hold.

A comparison in the same 186 m2 hall with four CRACs shows how extra redundancy reduces usable capacity and cabinet count. N+2 gives 180 kW for 40 cabinets at 4.5 kW (72% space use), while N+1 gives 270 kW for 52 cabinets at 5.2 kW (95%). The author also derives a cooling-per-perimeter-metre formula, P = K/L + M - (6.4 x R/S), where P is kW per perimeter metre, K the CRAC net capacity, L the length, M the side clearance, R the redundancy and S the one- or two-sided layout.

The conclusion is that for efficient space use with CRAC-only cooling the average load per cabinet should not exceed about 6 kW; a 20 kW average cabinet in N+2 needs a CRAC area about twice the IT cabinet area. Higher densities require row- or cabinet-based active cooling, and passive chimney cabinets are viable only for a few cabinets per row. The article's limit is that it rests on one CRAC example and the assumed clearances.

Key points

  1. Example CRAC: about 90 kW net sensible in a 3 x 1 m footprint; layouts modelled with 10, 14 and 18 m air throw and units on one or two sides.
  2. Clearances assumed: 500 mm side and 1,000 mm long-side maintenance space, at least 2 m from nearest cabinet to CRAC, 1,000 mm hot aisle and 1,200 mm cold aisle.
  3. Same 186 m2 hall with four CRACs: N+2 gives 180 kW for 40 cabinets at 4.5 kW (72% space use) while N+1 gives 270 kW for 52 cabinets at 5.2 kW (95%).
  4. Formula: P = K/L + M - (6.4 x R/S), where P = kW per perimeter metre, K = CRAC net capacity, L = length, M = side clearance, R = redundancy, S = one/two-sided layout.
  5. For efficient space use with CRAC-only cooling, average load per cabinet should not exceed about 6 kW; a 20 kW average cabinet in N+2 needs CRAC area about twice the IT cabinet area.
  6. Passive hot-air-removal cabinets cannot remove more heat than the cold air supplied, debunking 20 kW+ per cabinet claims.
  7. Higher densities require row- or cabinet-based active cooling; passive chimney cabinets are only viable for a few cabinets per row.

Using it in design

  • When only perimeter CRAC/CRAH cooling is selected, warn above about 6 kW average per cabinet and require row, rack or liquid cooling for 20 kW and above.
  • Use the per-perimeter-metre formula and throw distance to auto-check CRAC count and placement.
  • Show the space lost to each extra redundant unit.
  • Compare N+1 and N+2 in the same hall in terms of cabinet count and capacity.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Mechanical designers who size raised-floor CRAC/CRAH cooling and assess redundancy and space use.

Related standards

  • ASHRAE TC9.9 Thermal Guidelines

Publication details

Authors
Hussein Shehata
Publisher
Uptime Institute Journal
Year
2014
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Hussein Shehata (2014). Data Center Cooling: CRAC/CRAH redundancy, capacity, and selection metrics (Hussein Shehata). Uptime Institute Journal. https://journal.uptimeinstitute.com/data-center-cooling-redundancy-capacity-selection-metrics/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.