Resiliency Considerations with Direct Liquid Cooling
Uptime Institute Intelligence
A short Uptime Intelligence report on the resiliency questions raised as cold-plate and immersion direct liquid cooling (DLC) moves into mission-critical sites.
On this page
Overview
This document is the report Uptime Intelligence published in November 2023 as UII Briefing Report 117. The full report is 14 pages and needs registration or a subscription; the public part is a 4-page executive summary. What is described here rests only on the landing-page description and abstract. The report's detailed findings, diagrams and recommendations are outside the scope of this page. This page is therefore a preview rather than a substitute for the full text; for detailed assessment, consult the report itself on the publisher's site. This page is therefore a preview rather than a substitute for the full text; for detailed assessment, consult the report itself on the publisher's site.
The starting point is that direct liquid cooling is expanding beyond technical computing into mission-critical installations that have strict cooling resiliency demands. The report covers both cold-plate and immersion systems. According to the abstract, DLC introduces new failure scenarios that conventional air cooling does not have, and it complicates the split of responsibilities between facilities and IT teams. The abstract treats this as a design question, not only an operational one.
The authors note that applicable guidance is scarce. To help fill the gap, the report proposes guiding questions that start from business objectives. In other words, instead of a ready-made specification it offers a framework in which each site questions its resiliency level against its own continuity target. The document is not a standard and contains no numerical design criteria.
Key points
- UII Briefing Report 117, November 2023; the 4-page executive summary of the 14-page report is public.
- Covers cold-plate and immersion DLC.
- DLC is expanding beyond technical computing into mission-critical sites.
- DLC introduces new failure scenarios.
- It complicates the split of responsibilities between facilities and IT teams.
- Applicable guidance is scarce; the report proposes guiding questions starting from business objectives.
Using it in design
- DLC design checks: CDU redundancy, TCS loop isolation and ride-through for pumps.
- List the failure scenarios in the cooling loop (leak, pump loss, CDU failure) at design stage and assess the impact of each.
- Define the responsibility boundary of the liquid loop between facilities and IT explicitly in contracts and operating procedures.
- Derive the resiliency level from the business objective (acceptable downtime) first, then choose equipment redundancy to match.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Check cooling capacity alongside your design
Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.
Request a demo
Who should read it
Cooling designers and operations teams planning to add liquid cooling to a mission-critical site.
Publication details
- Authors
- Uptime Institute Intelligence
- Publisher
- Uptime Institute Intelligence
- Year
- 2023
- Document number
- UII Briefing Report 117
- Document language
- English
- Source type
- Industry body
- Access
- Citation only
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note
Report behind a registration form (or Uptime Intelligence subscription); copyright Uptime Institute. Facts taken only from the public landing page / press release. Citation only.
Citation
Uptime Institute Intelligence (2023). Resiliency Considerations with Direct Liquid Cooling. Uptime Institute Intelligence. UII Briefing Report 117. https://uptimeinstitute.com/resources/research-and-reports/resiliency-considerations-with-direct-liquid-cooling