Research paperFree to read2026

Keeping Data Centers Online in Weak Grids: PLL-Free VM-DPC With Adaptive Reactive-Power Support for Centralized UPS Systems

arXiv (author manuscript) · Jesus D. Vasquez-Plaza, Yonghao Gui et al.

An Oak Ridge National Laboratory study: in a 1 MVA centralized UPS facility, PLL-based PI rectifier control goes unstable at SCR of 2 or below, while PLL-free VM-DPC with adaptive reactive-power support restores stable operation.

On this page

Overview

The paper examines the stability of the front-end rectifier in a centralized UPS architecture when AI workloads create fast power swings and the grid's short-circuit ratio (SCR) is low. In a centralized design the rectifier processes the facility's full power continuously, so an instability there spreads through the DC link to the inverter, IT load, cooling and auxiliaries, and also disturbs the point-of-common-coupling (PCC) voltage.

The method is a detailed switching-level model in MATLAB/Simulink, validated in real time on an OPAL-RT platform. The modelled facility is 1 MVA in total (0.77 MVA IT load, 0.23 MVA cooling and support). Conventional PLL-based PI rectifier control is compared with voltage-modulated direct power control (VM-DPC), which regulates active and reactive power directly without PLL synchronisation.

The PLL-based PI controller becomes unstable at SCR of 2 or below, with DC-link oscillation and voltage collapse. VM-DPC with a fixed reactive-power reference stabilises the system once the reference is high enough (250 kVAr and above). The proposed adaptive reactive-power support adjusts the reference to the instantaneous operating condition, reaching the same stability with less reactive power and removing the need to pick PF or Q by hand.

The authors present the work not as a new DPC algorithm but as an application-specific extension of the VM-DPC framework to centralized UPS rectifiers; it extends a preliminary conference version and is a preprint submitted to IEEE Transactions on Smart Grid. The results rest on simulation and real-time validation, with no field measurements. For designers planning large loads in weak-grid regions it shows how much rectifier control matters for grid compatibility.

Key points

  1. The instability threshold is SCR of 2 or below; under this condition PLL-based PI rectifier control shows DC-link oscillation and collapse.
  2. The modelled facility is 1 MVA: 0.77 MVA IT load and 0.23 MVA cooling and support; switching frequency 10 kHz, grid frequency 60 Hz.
  3. With PI control, a power-factor reference of 1.00 gives instability at 2.05 s; at 0.96 this extends to 24.96 s (average reactive power up to about 268 kVAr).
  4. With VM-DPC and fixed Q, references of 200 kVAr and below eventually go unstable (2.21 s at Q=0, 11.01 s at 200 kVAr); 250 and 300 kVAr stay stable over the full IT load profile.
  5. Adaptive VM-DPC cuts average reactive power by 27.6% versus PI and 35.0% versus fixed 250 kVAr VM-DPC (173.51 kVAr against 239.61 and 267.08 kVAr).
  6. The adaptive controller holds a minimum PCC voltage of 388.60 V, against 389.35 V for PI and 361.78 V for fixed-Q VM-DPC.
  7. Validation uses a MATLAB/Simulink switching-level model and an OPAL-RT real-time platform.
  8. The work is supported by the US Department of Energy and is a preprint submitted to IEEE Transactions on Smart Grid.

Using it in design

  • For centralized UPS plants on weak grids, give the UPS vendor the SCR and X/R at the point of connection and require proof that the rectifier control is stable at those values.
  • Ask in the specification whether the UPS front-end rectifier uses a PLL-free or weak-grid-validated synchronisation method, and what reactive-power capability it offers.
  • Plan a grid-compatibility study that evaluates the fast, low-frequency power swings of AI clusters together with UPS rectifier bandwidth and PCC voltage dynamics.
  • If reactive-power support is needed, prefer an adaptive strategy over a fixed high setpoint and check that the rectifier has enough reactive capability (kVA headroom).
  • Include a real-time simulation or hardware-in-the-loop step in commissioning planning so stability evidence exists before site tests.

Who should read it

Electrical engineers designing large data-centre connections in weak-grid regions, UPS control developers, and consultants performing grid-compatibility studies.

Document contents

  1. Introduction
  2. Centralized UPS data center detailed model
  3. Instability mechanism of PLL-based UPS control
  4. Proposed VM-DPC with adaptive reactive-power support
  5. Real-time simulation and results
  6. Conclusion

Publication details

Authors
Jesus D. Vasquez-Plaza; Yonghao Gui; Jin Dong; Jamie Lian; Yilu Liu
Publisher
arXiv (author manuscript)
Year
2026
Document number
arXiv:2608.06521v1
Document language
English
Source type
Scientific
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Article-specific arXiv view-license link grants arXiv a non-exclusive distribution right; this is not general commercial redistribution permission.

Citation

Jesus D. Vasquez-Plaza; Yonghao Gui; Jin Dong; Jamie Lian; Yilu Liu (2026). Keeping Data Centers Online in Weak Grids: PLL-Free VM-DPC With Adaptive Reactive-Power Support for Centralized UPS Systems. arXiv (author manuscript). arXiv:2608.06521v1. https://doi.org/10.48550/arXiv.2608.06521

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.