Technical guideFree to read2025

MPS for Data Centres: Observations from the Climate Neutral Data Centre Pact

Original title Minimum Performance Standards for Data Centres - Observations from the Climate Neutral Data Centre Pact

Climate Neutral Data Centre Pact (CNDCP) · Climate Neutral Data Centre Pact, Ratings Working Group

A 17-page 2025 paper from the Climate Neutral Data Centre Pact arguing that EU minimum performance standards for data centres are premature, and that a PUE floor should sit near 1.8-1.9.

On this page

Overview

The paper comes from the Ratings Working Group of the Climate Neutral Data Centre Pact (CNDCP), founded in 2021, which reports over 100 signatories representing 85% of European data-centre market share. It responds to the minimum performance standard (MPS) proposals under discussion as of 18 June 2025 from the Commission's study team. It focuses on strategic and process shortcomings and briefly reviews the proposed thresholds.

Main objections: Energy Efficiency Directive (EED) Article 12 reporting is incomplete and error-ridden because few Member States met the May 2024 deadline; the EED scope exempts IT load below 500 kW, likely excluding the worst performers (a 100 kW threshold is suggested); an MPS should be a floor removing the worst facilities, while continuous improvement belongs to rating and disclosure; and PUE and WUE lack climate normalisation.

The paper separates four policy tools: EED reporting, labelling/rating, MPS and pre-qualifying procurement criteria, and calls the assumption that MPS will do both floor and improvement jobs a fallacy. Proposed PUE values do not match EED data; the data suggest a genuine MPS near 1.8 or 1.9. Pact WUE and PUE targets are ambitious targets, not floors, and were converted into MPS without the allowances that create a level playing field.

Annex I proposes a data-maturity roadmap: phased data collection and validation, compliance and completeness thresholds, sample audits, 3-4 years of validated data, pilots and iterative policy development. Annex II draws lessons from minimum energy standards in housing. The paper is an industry position, not an independent technical analysis.

Key points

  1. The Pact reports over 100 signatories representing 85% of European data-centre market share.
  2. Few Member States met the May 2024 EED Article 12 deadline; first-round data are incomplete and erroneous.
  3. MPS review should wait for at least two full reporting cycles and a finalised rating scheme.
  4. EED scope exempts IT load below 500 kW; lowering it to 100 kW is proposed.
  5. An MPS should be a floor; continuous improvement is the job of rating and disclosure.
  6. EED data suggest a genuine PUE MPS near 1.8 or 1.9.
  7. Lack of climate normalisation for PUE and WUE is criticised; over-ambitious WUE floors could exclude the most efficient sites.
  8. The data-maturity roadmap calls for 3-4 years of validated data and pilot programmes.

Using it in design

  • Set the design PUE target against realistic annual PUE for the site's climate zone, not only against a possible EU floor.
  • Note the risk of future WUE floors in permitting and licensing plans when selecting water-based cooling.
  • Plan the sub-metering structure (IT load, total energy, water, renewable share) at design stage for EED Article 12 reporting.
  • In colocation design, resolve access to customer data through contracts and metering architecture.
  • In regulatory scenario analysis, compare design margin against floors such as 1.8-1.9.

Who should read it

Decision makers investing in or operating EU data centres, and sustainability and regulatory specialists.

Document contents

  1. Preface
  2. Introduction
  3. Summary of strategic issues (objectives, scope, maturity)
  4. Data immaturity and other shortcomings
  5. Incorrect scope
  6. Conflating policy tools
  7. Failure to implement climate normalisation
  8. Misalignment with other policy agendas
  9. Hostages to fortune: potential for perverse outcomes
  10. Preliminary clarifications urgently needed
  11. Summary feedback on proposed MPSs
  12. Annex I: Addressing data shortcomings through a data maturity roadmap
  13. Annex II: MPSs driving perverse outcomes

Related standards

  • Directive (EU) 2023/1791
  • Delegated Regulation (EU) 2024/1364

Publication details

Authors
Climate Neutral Data Centre Pact, Ratings Working Group
Publisher
Climate Neutral Data Centre Pact (CNDCP)
Year
2025
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No open licence stated.

Citation

Climate Neutral Data Centre Pact, Ratings Working Group (2025). Minimum Performance Standards for Data Centres - Observations from the Climate Neutral Data Centre Pact. Climate Neutral Data Centre Pact (CNDCP). https://www.climateneutraldatacentre.net/wp-content/uploads/2025/07/MPS-for-Data-Centres-Observations-from-the-Climate-Neutral-Data-Centre-Pact_website1.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.