Climate Neutral Data Centre Pact (CNDCP) · Climate Neutral Data Centre Pact

The Pact's 2025 initiative sets PUE of 1.3 (cool) and 1.4 (warm climates) for new data centres above 50 kW, and matching electricity with 75% clean energy by end-2025 and 100% by 2030.

On this page

Overview

The Climate Neutral Data Center Pact is committed to the European Green Deal and to Europe becoming climate neutral by 2050, and holds that data centres can meet thresholds consistent with it. The initiative makes self-regulatory commitments under five headings: energy efficiency, clean energy, water, circular economy and circular energy system.

On energy efficiency, from 1 January 2025 new data centres at full capacity meet an annual PUE of 1.3 in cool climates and 1.4 in warm climates; existing centres reach the same targets by 1 January 2030. The targets apply to all centres above 50 kW maximum IT power demand. On clean energy, electricity demand is matched with 75% renewable or hourly carbon-free energy by 31 December 2025 and 100% by 31 December 2030. On water, from 2025 new centres using potable water in cool climates in water-stressed areas are designed to a maximum WUE of 0.4 L/kWh; existing centres that replace a cooling system must meet the new-centre target by 31 December 2040.

On circular economy, 100% of used server equipment is assessed for reuse, repair or recycling. On the circular energy system, operators investigate whether feeding captured heat into district heating is practical, environmentally sound and cost effective. The appendix defines the metrics: PUE is measured per ISO/IEC 30134-2:2016 or EN 50600-4-2; cool climate is a 2019 Eurostat NUTS 2 cooling degree-day value of 49.99 or below; full capacity is 24 months after operation begins. The WUE limit is adapted by the formula 0.4 L/kWh x climate x stress x water type.

Key points

  1. PUE targets: from 1 January 2025 for new centres, 1.3 in cool and 1.4 in warm climates; the same targets for existing centres by 1 January 2030.
  2. The targets apply to all centres above 50 kW maximum IT power demand.
  3. Clean energy: electricity demand matched with 75% renewable or hourly carbon-free energy by 31 December 2025 and 100% by 31 December 2030.
  4. WUE: maximum 0.4 L/kWh for new cool-climate centres using potable water in water-stressed areas; existing centres replacing cooling systems must comply by 31 December 2040.
  5. WUE limit = 0.4 L/kWh x climate x stress x water type; climate factor 1.0 cool and 1.1 hot; stress factors Low 5, Low-Medium 4, Medium-High 2.5, High 1; water type factors potable and fresh 1, grey 3, black, brackish or sea 6.
  6. Cool climate: 2019 Eurostat NUTS 2 cooling degree days of 49.99 or below; warm climate 50.00 or above.
  7. Full capacity is 24 months after operation begins; up to 10% of centres using less than 75% of design critical load over a rolling 90-day period may be exempted.
  8. Circular economy: 100% of used server equipment assessed for reuse, repair or recycling; district heating connection is investigated for heat.

Using it in design

  • On a European project, set the site's climate class (cool or warm) from NUTS 2 cooling degree days and enter a PUE target of 1.3 or 1.4 as a design input.
  • Calculate PUE to the ISO/IEC 30134-2 or EN 50600-4-2 boundary; at 2 MW and below, office and ancillary building energy may be excluded.
  • For water-cooled designs, calculate the WUE limit with the formula (climate, stress, water type); using grey water or sea water raises the limit.
  • Structure the electricity supply contract to fit the 75% and 100% clean energy matching roadmap.
  • Assess heat supply to district heating at the start in site selection and cooling outlet temperature design.

Who should read it

Teams designing and operating data centres in Europe and sustainability managers tracking compliance with sector self-regulatory commitments.

Document contents

  1. Energy efficiency
  2. Clean energy
  3. Water
  4. Circular economy
  5. Circular energy system
  6. Appendix: Definitions, metrics and key terms

Related standards

  • ISO/IEC 30134-2
  • ISO/IEC 30134-9:2022
  • EN 50600-4-2
  • EN 50600-4-3

Publication details

Authors
Climate Neutral Data Centre Pact
Publisher
Climate Neutral Data Centre Pact (CNDCP)
Year
2025
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No open licence stated; site footer reads (c) 2021-2026 Climate Neutral Data Center Pact.

Citation

Climate Neutral Data Centre Pact (2025). Climate Neutral Data Center Pact - Initiative for Climate Neutral Data Centers in Europe (Self-Regulatory Initiative commitments, 2025 edition). Climate Neutral Data Centre Pact (CNDCP). https://www.climateneutraldatacentre.net/wp-content/uploads/2025/06/CNDCP-Initiative-2025.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.