A 2025 discussion paper by Pact signatories argues that PUE, WUE and REF could be core metrics in an A-G style data-centre rating, ERF could not, and operators should only answer for what they control.

On this page

Overview

The paper gathers the views of Climate Neutral Data Centre Pact (CNDCP) signatories on developing a standardised energy rating scheme for data centres. The Pact is described as a voluntary self-regulatory initiative covering 85% of the EU data-centre market. The paper notes the sector has many standardised metrics for infrastructure efficiency, water use and renewable power, but no combined metric and no standardised metric for the actual productivity of IT functions, and asks for a cautious approach.

The discussion is modular: clarifying objectives, scope, pitfalls of existing schemes, sustainability indicators, challenges of focusing on actual rather than theoretical performance, infrastructure and IT metrics, reporting principles, classifying variables, pros and cons of a minimum efficiency rating, weighting versus allowances, comparing options, rating visuals, facility categories and confidentiality. Variables outside operator control that affect operational PUE are facility age, size, location (degree days), redundancy, business model and occupancy, and utilisation.

Signatories say PUE, WUE and REF are suitable infrastructure metrics for a rating, while ERF cannot be a core metric because it does not measure operational efficiency. IT metrics are not yet standardised; CSERV could be a trial metric. Design PUE is useful as an interim indicator for new facilities, but changes when a facility is upgraded and does not reflect real conditions. A minimum efficiency threshold must apply to the whole class, with no exemption for public-sector centres; it could be expressed as a design PUE of, say, 1.5 or 2, but would capture few sites.

Four broad approaches are compared: a single metric (PUE) with bonus metrics, governance and standards compliance, a weighted multi-criteria assessment and a multi-criteria, multi-category assessment. The sample tables are illustrative only. The paper is a discussion document; it does not define a rating scheme.

Key points

  1. The Pact is a voluntary self-regulatory initiative covering 85% of the EU data-centre market.
  2. There is currently no combined metric for data centres and no standard metric for IT function productivity.
  3. Reporting obligations should be limited to functions under the operator's direct control.
  4. Infrastructure metrics suited to a rating: PUE, WUE and REF; ERF cannot be a core metric because it does not measure operational efficiency.
  5. IT metrics are not standardised; CSERV could be a trial metric.
  6. Variables outside control that affect real PUE: facility age, size, location (degree days), redundancy, business model, occupancy and utilisation.
  7. Design PUE can be an interim indicator for new facilities but changes with upgrades and ignores real conditions; a minimum threshold should apply to the whole class with no public-sector exemption.
  8. Four approaches: single metric with bonus, governance and compliance, weighted multi-criteria, multi-criteria multi-category.

Using it in design

  • In design documents, separate PUE as a design value and an operating value, and show the occupancy effect in the first years after commissioning separately.
  • When a water-intensive cooling system is chosen to lower PUE, report WUE alongside it; in a rating, a PUE gain will be balanced against water cost.
  • Document uncontrolled variables such as climate (degree days), redundancy level and target occupancy explicitly in design assumptions.
  • Define measurement boundaries to match the operator's control; in colocation and cloud set-ups with shared responsibility, state in the contract who reports what.
  • Build the infrastructure for REF and WUE measurement (renewable share and water meters) together with PUE.

Who should read it

Operators, designers and regulators following data-centre rating and reporting policy, and industry bodies.

Document contents

  1. Executive summary and purpose
  2. Glossary of terms
  3. What is the Climate Neutral Data Centre Pact
  4. Broad points of agreement from Pact signatories
  5. Core principles for rating data centres
  6. Clarifying objectives
  7. Scope
  8. Avoiding existing pitfalls and perverse outcomes
  9. Data centre sustainability indicators
  10. Challenges of focusing on actual, not theoretical performance
  11. Infrastructure metrics
  12. IT metrics
  13. Reporting obligations
  14. Classifying infrastructure variables
  15. Pros and cons of a minimum efficiency rating
  16. Weighting versus allowances
  17. Comparing options
  18. Rating scheme visuals
  19. Categorising facilities
  20. Confidentiality

Related standards

  • ISO/IEC 30134-2
  • ISO/IEC 30134-9
  • ISO/IEC 30134-3
  • Delegated Regulation (EU) 2024/1364

Publication details

Authors
Climate Neutral Data Centre Pact
Publisher
Climate Neutral Data Centre Pact (CNDCP)
Year
2025
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No open licence stated.

Citation

Climate Neutral Data Centre Pact (2025). A Rating Scheme for Data Centres - Technical Discussion Paper. Climate Neutral Data Centre Pact (CNDCP). https://www.climateneutraldatacentre.net/wp-content/uploads/2025/04/CNDCP-A-Rating-Scheme-for-Data-Centres.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.