Climate Neutral Data Centre Pact - Water Usage Metric Proposal (Summary and Annexes)
Climate Neutral Data Centre Pact (CNDCP) · Climate Neutral Data Centre Pact, Water Usage Working Group
The CNDCP's 2021 workshop proposal sets a location-dependent maximum WUE with WUEmax = K0 x K1 x K2 x K3; the target is 0.4 L/kWh for potable water, cool climate and high water stress.
On this page
Overview
The document records the outcome of the Climate Neutral Data Centre Pact water usage group workshops held from March to November 2021. The group concluded that responsible water use should be reflected in a single KPI that drives the most responsible cooling technology choice for a given location. The chosen metric is Water Usage Effectiveness, site value (WUE category 1) per ISO/IEC 30134-9, and the Pact establishes a location-dependent maximum.
The maximum WUE depends on three parameters: climate, water availability and water type. Operators cannot significantly influence the first two; the third is their responsibility. The formula is WUEmax = K0 x K1 (climate) x K2 (water stress) x K3 (water type), with K0 = 0.4 L/kWh. K1 is 1.0 for cooling degree days (CDD) < 50 and 1.1 for CDD ≥ 50. K2 is 5 for low water stress, 4 low-medium, 2.5 medium-high and 1 high (WEI+ bands 0-10, 10-20, 20-40, > 40). K3 is 1 for potable or fresh water, 3 for grey water and 6 for black, brackish or sea water.
Tabulated values: for potable water in a cold climate, low stress 2.00, low-medium 1.60, medium-high 1.00 and high 0.40 L/kWh; in a hot climate 2.20, 1.76, 1.10 and 0.44 L/kWh. Grey water values run from 1.20 to 6.60 L/kWh and black or salty water from 2.40 to 13.20 L/kWh. New data centres must meet the target by 2025; existing ones from 1 January 2025 when the cooling system reaches end of service life, and no later than 2040.
The annexes cover context, objectives (a simple, holistic model based on public physical data), the climate regionalisation approach (cold and hot, as in the Pact's PUE calibration), four water stress levels, water type, determination of correction factors and model analysis. Climate data for Europe are interpolated on 25 km grids.
Key points
- Metric: WUE site value (category 1) per ISO/IEC 30134-9; the Pact sets a location-dependent maximum.
- Formula: WUEmax = K0 x K1 x K2 x K3; K0 = 0.4 L/kWh.
- K1: 1.0 for CDD < 50 (cold), 1.1 for CDD ≥ 50 (hot).
- K2: water stress low 5, low-medium 4, medium-high 2.5, high 1 (WEI+ 0-10, 10-20, 20-40, > 40).
- K3: potable/fresh water 1, grey water 3, black/brackish/sea water 6.
- Potable water WUEmax ranges from 0.40 L/kWh (cold, high stress) to 2.20 L/kWh (hot, low stress).
- Grey water up to 6.60 L/kWh, black or salty water up to 13.20 L/kWh.
- New data centres meet the target by 2025; existing ones at end of cooling system life, no later than 2040.
- The climate split follows the Pact's PUE calibration approach; the operator can influence only the water type.
Using it in design
- For a new European site, compute WUEmax from K0, K1, K2 and K3 and use it as a constraint when choosing the cooling architecture (evaporative or dry).
- Determine site water stress with WEI+ (or a similar metric) and take CDD from European meteorological databases.
- If grey water or other alternative sources are chosen, treat the WUE budget widened by K3 as a design opportunity.
- Optimise the WUE and PUE trade-off together for the climate and location.
- For existing sites, align the cooling system renewal schedule with the 2040 compliance date.
Who should read it
Engineers designing data centres in Europe and sustainability managers setting water targets under the CNDCP commitment.
Document contents
- Preamble and Synthesis
- Correction Factors and WUEmax Tables
- Context and Challenges
- Objectives of the Water Working Group
- Influencing Parameters: Climate, Water Availability, Water Type
- Modeling Principles
- Determination of Correction Factors
- Model Adjustment and Analysis
Related standards
- ISO/IEC 30134-9:2022
- ISO 14046
- ISO 12056-1
Publication details
- Authors
- Climate Neutral Data Centre Pact, Water Usage Working Group
- Publisher
- Climate Neutral Data Centre Pact (CNDCP)
- Year
- 2024
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
No licence statement in the document or on the downloads page.
Citation
Climate Neutral Data Centre Pact, Water Usage Working Group (2024). Climate Neutral Data Centre Pact - Water Usage Metric Proposal (Summary and Annexes). Climate Neutral Data Centre Pact (CNDCP). https://www.climateneutraldatacentre.net/wp-content/uploads/2025/09/White-paper-on-DC-responsible-use-of-water-review-2024.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.