The U.S. Department of Energy's July 2025 assessment of US resource adequacy to 2030 under combined generator retirements and large load growth, driven largely by data centres. It gives data-centre developers a regional indication of where grid supply risk, curtailment and on-site generation needs are likely to be highest.

U.S. public domain: U.S. Government work; free to reuse

On this page

Overview

The report presents a resource-adequacy model developed with Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL), built on NERC's Interregional Transfer Capability Study (ITCS) data. Unlike typical peak-hour assessments, it simulates the grid hour by hour across multiple weather years with optimised inter-regional transfers. Three 2030 scenarios are compared; the main distinction is between announced plant closures going ahead (Plant Closures) and no retirements at all (No Plant Closures).

The key demand assumption is data-centre load. Organisations' projections of incremental data-centre electricity use by 2030 range from 35 GW to 108 GW; DOE adopts a 50 GW national midpoint consistent with central EPRI and LBNL projections and allocates it regionally using state-level growth ratios from an S&P forecast. A further 51 GW of non-data-centre load growth was modelled from NERC data. No additional AI or data-centre load was modelled for ISO-NE and NYISO.

On the reliability standard, the report argues that the traditional 1-in-10 loss-of-load-expectation criterion does not capture outage duration or magnitude. It uses two measures instead: no more than 2.4 hours of lost load per year (one day in ten years) and normalised unserved energy (NUSE) of at most 0.002%. Loss-of-load hours (LOLH) and NUSE are reported by region, and a perfect-capacity deficit shows how much additional capacity is needed.

According to the results, 104 GW of firm capacity is scheduled to retire by 2030; it is projected to be replaced by 209 GW of new generation, of which only 22 GW is firm baseload. In the plant-closures scenario annual LOLH rises about 100 times, and even with no retirements outage risk rises 34 times. The report is a DOE document prepared under Executive Order 14262 and presents modelled scenarios rather than forecasts.

Key points

  1. 104 GW of firm capacity is scheduled to retire by 2030; in the plant-closures scenario annual loss-of-load hours rise by a factor of about 100.
  2. Retirements are projected to be replaced by 209 GW of new generation, of which only 22 GW is firm baseload; even with no retirements outage risk rises by a factor of 34.
  3. Projections of incremental data-centre load by 2030 range from 35 GW to 108 GW; DOE assumes a 50 GW midpoint consistent with EPRI and LBNL.
  4. An additional 51 GW of non-data-centre load growth was modelled from NERC data.
  5. Reliability standard: at most 2.4 hours of lost load per year (LOLH) and NUSE of 0.002%.
  6. In the plant-closures case all regions except ISO-NE and NYISO fail the thresholds (no additional data-centre load was modelled for those two).
  7. In the plant-closures case LOLH ranges from 7 hours/year in CAISO to 430 hours/year in PJM; maximum hourly load shortfall reaches 43% in PJM and 31% in CAISO.
  8. NUSE ranges from 0.0032% (non-CAISO West) to 0.1473% (PJM) in the plant-closures case.
  9. With no plant closures, PJM still averages 214 hours/year (NUSE 0.066%), SPP 48 hours and ERCOT 20 hours.

Using it in design

  • In site selection, compare the grid region (PJM, ERCOT, SPP, SERC and so on) against its resource-adequacy risk; in high-risk regions add connection delay and curtailment scenarios to the project schedule.
  • For on-site generation and storage (generators, batteries, additional capacity), use the regional lost-load hours and worst-year hours as input to the sizing analysis.
  • To prepare for contracts that require flexible or curtailable load, define the split between critical and curtailable load at design stage.
  • In the power-supply strategy, reflect the winter risk (the report notes persistent winter shortfalls) and fuel resilience in the backup-power design.
  • Use the report's hourly LOLH and NUSE measures as a reference for quantifying grid supply risk in your own reliability assessments.

Who should read it

Data-centre developers and site-selection teams, power-procurement and energy-strategy managers, grid-connection engineers and policy analysts.

Document contents

  1. Executive Summary (key takeaways, uniform methodology, reliability standard, key results, required build)
  2. Modeling Methodology (modeling resource adequacy, planning years and weather years, load modeling, transfer capabilities, perfect capacity additions)
  3. Regional Analysis (MISO, ISO-NE, NYISO, PJM, SERC, SPP, CAISO+, West non-CAISO, ERCOT)
  4. Appendix A: Generation Calibration and Forecast
  5. Appendix B: Representing Canadian Transfer Limits
  6. References and EO 14262

Read the document

doe-resource-adequacy-report-2025.pdf

PDF · 6.2 MB · English

U.S. public domain: U.S. Government work; free to reuse

The document is provided unaltered because its licence permits redistribution.

Publication details

Authors
U.S. Department of Energy; Pacific Northwest National Laboratory (PNNL); National Renewable Energy Laboratory (NREL)
Publisher
U.S. Department of Energy
Year
2025
Document language
English
Source type
Government / public
Access
Open licence (downloadable)
Licence
U.S. public domain: U.S. Government work; free to reuse
Licence evidence
www.copyright.gov
Original licence note

Published by a U.S. federal agency; works of the U.S. Government are not protected by copyright (17 U.S.C. 105).

Citation

U.S. Department of Energy; Pacific Northwest National Laboratory (PNNL); National Renewable Energy Laboratory (NREL) (2025). Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid (July 2025). U.S. Department of Energy. https://www.energy.gov/sites/default/files/2025-07/DOE%20Final%20EO%20Report%20(FINAL%20JULY%207).pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.