Selective Coordination (Cooper Bussmann Electrical Protection Handbook section)
Eaton
Explains selective coordination of overcurrent protective devices: only the nearest upstream device should open for any overload or fault.
On this page
Overview
Three study methods are described: published fuse selectivity ratios, computer time-current analysis (to be interpreted against available fault current), or hand overlays; some breaker makers publish tested coordination tables. Time-current curves cannot prove coordination below 0.01 s: in the example, 100 A and 400 A time-delay fuses show coordination on curves only up to about 11,000 A, and above that both operate in under 0.01 s so ratios must be used.
Fuse selectivity requires the load-side total clearing I2t to be less than the line-side melting I2t; Low-Peak fuse families need a 2:1 amp-rating ratio, while other combinations need up to 8:1.
Once a breaker unlatches it will open; instantaneous-trip breakers typically unlatch in less than 0.01 s, so overlap of curves in the instantaneous region means lack of coordination. Breakers with short-time delay can hold on to faults for up to 30 cycles so downstream devices clear first; MCCBs/ICCBs with STD still have an instantaneous override, and STD-rated breakers may carry lower interrupting ratings than the same frame with instantaneous trip.
The section also discusses mandatory coordination for emergency and critical systems and common objections.
Key points
- Three methods: published fuse selectivity ratios, computer time-current analysis, or hand overlays; some breaker makers publish tested tables.
- Example: 100 A and 400 A time-delay fuses coordinate on curves only up to ~11,000 A; above that both operate in under 0.01 s and ratios are needed.
- Fuse selectivity: load-side total clearing I2t below line-side melting I2t; Low-Peak families need 2:1 amp ratio, other combinations up to 8:1.
- A breaker that unlatches will open; instantaneous-trip breakers typically unlatch in under 0.01 s, so curve overlap in the instantaneous region means lack of coordination.
- STD breakers can hold faults up to 30 cycles; MCCBs/ICCBs with STD keep an instantaneous override, and may have lower interrupting ratings than the same frame with instantaneous trip.
Using it in design
- Record fuse class, breaker instantaneous-trip capability and short-time-delay band. When fault current places both devices below 0.01 s, use ratio or tested-pair tables rather than curves.
- Flag breaker pairs whose instantaneous regions overlap at the calculated fault current.
- For designs claiming full selectivity (emergency or critical branches, Tier IV) require documented tested pairs.
- Show a trade-off warning when STD increases arc-flash energy.
Who should read it
Electrical designers doing protection coordination and selectivity studies.
Related standards
- NEC 700.32
- NEC 701.32
- NEC 708.54
- NEC 517.26
- IEC 60947-2 Annex A
Publication details
- Authors
- Eaton
- Publisher
- Eaton
- Year
- 2008
- Document number
- Bussmann SPD 2008
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Eaton (2008). Selective Coordination (Cooper Bussmann Electrical Protection Handbook section). Eaton. Bussmann SPD 2008. https://web.archive.org/web/20251009021250/https://www.eaton.com/content/dam/eaton/products/electrical-circuit-protection/fuses/solution-center/bus-ele-tech-lib-selective-coordination-2008-spd.pdf