Risk Factors and Failure Statistics of Lithium Ion BESS
Original title Risk Factors and Failure Statistics of Lithium Ion BESS (EPRI White Paper, October 2026)
EPRI (Electric Power Research Institute) · EPRI, L. Srinivasan (Project Manager)
An EPRI white paper of October 2026 (3002034920): drawing on a global failure database, it finds lithium-ion BESS failures per deployed GWh fell 98% from 2018 to 2025 and are on the same order as large oil-filled transformers.
On this page
Overview
The report uses EPRI's BESS Failure Incident Database, started in 2021 after the South Korean fires and the Surprise, Arizona incident. The database tracks utility-scale and commercial and industrial BESS; failures in data-centre UPS systems are included where known and classed as C&I. A failure incident is defined as a large-scale thermal event, meaning arc flash, fire or explosion, in a BESS unit, caused by an issue internal to the system. Risk is treated as the combination of the likelihood of an incident and the severity of its consequences.
On likelihood, the report examines the failure rate over time, regional differences, rate by system age and the average annual rate. The global failure rate fell 50% between 2024 and 2025. The annual failure likelihood per BESS container is estimated at about 0.04 to 0.14%. For comparison it uses CIGRE's roughly 0.1% fire rate for large oil-filled transformers (1968 to 2001) and Doble's 0.32 to 0.56% failure rate in 2015 to 2021 Americas data. It notes that BESS has no long operating history and end-of-life failure modes are not yet known.
On consequences, 93% of incidents had no reported injuries or fatalities. No member of the public suffered acute injury from a BESS arc flash, fire or explosion. Since the 2019 Surprise, Arizona incident, no BESS-related injuries or fatalities have been reported in the US. In no recorded incident did fire spread beyond the facility. The analysis also covers risk factors: site architecture, system age and vintage, and cell chemistry.
For designers the most useful findings are the risk factors. Indoor (building-based) BESS facilities are over-represented in failures relative to deployment and sustain more damage on average in an incident. Preventing propagation within and between units is a critical part of risk management. Chemistry alone could not be shown to be a risk factor, because its effect cannot be separated from product maturity. The report names missing data and possibly missed incidents as limits.
Key points
- The annual failure rate per deployed GWh fell 98% from 2018 to 2025; the global rate fell 50% between 2024 and 2025.
- Annual failure likelihood per BESS container is about 0.04 to 0.14%; CIGRE puts large oil-filled transformer fire likelihood at about 0.1%, and Doble data show 0.32 to 0.56% failures.
- 93% of incidents in the database had no reported injuries or fatalities; no member of the public suffered acute injury.
- In no recorded utility-scale BESS incident did fire spread beyond the facility.
- After the 2019 Surprise, Arizona incident, no BESS-related injuries or fatalities were reported in the US.
- Indoor (building-based) BESS are over-represented in failures and sustain more damage on average; fire walls segment large indoor facilities and limit propagation.
- For a given vintage, failure likelihood falls with age (more failures early in life), and newer vintages show lower rates.
- Cell chemistry in isolation could not be established as a risk factor for system-level failure.
- The database holds 33 incidents not available in public sources; missing information and missed incidents limit the conclusions.
Using it in design
- In battery rooms, especially indoor installations, make propagation prevention within and between units (fire walls or barriers for segmentation) central to the risk analysis.
- In risk assessments, use the benchmark of 0.04 to 0.14% against familiar assets such as transformers (about 0.1%), while noting that end-of-life behaviour is not yet known.
- For older-vintage systems, put safety review, code-compliant retrofit or retirement options into the maintenance plan.
- Adapt emergency-response planning from transformer fire procedures and schedule first-responder training.
- Evaluate chemistry choice together with product design maturity, propagation test results and explosion mitigation, not on chemistry alone.
Who should read it
Project owners, operators, insurers and permitting authorities who develop, design, insure and license battery energy storage systems.
Document contents
- Introduction (key findings)
- Data and Methodology
- Likelihood of Incidents (frequency over time, regional comparison, failure rate by operational year, comparison to transformers)
- Consequence of Incidents (life safety, civic impact, environmental and public health, consequence comparison)
- Analysis of Risk Factors (site architecture, system age and vintage, battery chemistry)
- Conclusion
- Appendices (non-public incidents, regional failure rates, energy density, injury count methodology, statistical analysis)
Related standards
- NFPA 855
- UL 9540A
- UL 9540
Publication details
- Authors
- EPRI; L. Srinivasan (Project Manager)
- Publisher
- EPRI (Electric Power Research Institute)
- Year
- 2026
- Document number
- 3002034920
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
(c) 2026 Electric Power Research Institute, Inc. All rights reserved; public download.
Citation
EPRI; L. Srinivasan (Project Manager) (2026). Risk Factors and Failure Statistics of Lithium Ion BESS (EPRI White Paper, October 2026). EPRI (Electric Power Research Institute). 3002034920. https://restservice.epri.com/publicdownload/000000003002034920/0/Product
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.