Research paperFree to read2020

Investigative Report on Electrical Commissioning in HPC Data Centers

IEEE / Energy Efficient High Performance Computing Working Group · Joseph Prisco, Grant Stewart et al.

The EE HPC Working Group's IEEE CLUSTER 2020 report concludes that HPC data centres need their own electrical commissioning guidelines because of dense, fluctuating compute loads.

On this page

Overview

The Energy Efficient High Performance Computing Working Group (EE HPC WG) assembled a small, diverse team to write a short report evaluating the need for electrical commissioning guidelines specific to HPC data centres, given their unique IT load densities and power profiles.

The team's consensus is that special guidelines are needed and that the EE HPC WG will author the first ones. The scope covers the static and dynamic electrical aspects of commissioning specific to HPC and, importantly, the transient aspects, because the fluctuating nature of compute nodes can strongly influence generation, transmission and distribution of power.

The guidelines will draw on lessons learned and best practices from HPC data centres. The primary audience is facility engineers and operators of HPC data centres, and the guidelines also address those who support them, from utilities and grid infrastructure to IT equipment manufacturers whose machines are commissioned at the end of the process. The paper is the needs assessment, not the guideline itself.

Key points

  1. The report is an EE HPC WG paper at IEEE CLUSTER 2020.
  2. Conclusion: HPC-specific electrical commissioning guidelines are needed.
  3. Scope covers static, dynamic and especially transient electrical behaviour.
  4. Fluctuating compute-node load can strongly affect generation, transmission and distribution.
  5. Renovations and retrofits are included in the commissioning lifecycle.

Using it in design

  • For HPC or AI halls, add transient scenarios (sudden load steps) to the commissioning plan alongside static and dynamic tests.
  • Design load-bank tests to approximate the fluctuating profile of real IT load.
  • Include renovations and retrofits in the commissioning scope.
  • Share commissioning expectations early with the utility and the IT vendor.

Who should read it

HPC facility engineers, operators and designers preparing commissioning plans for densely loaded halls.

Publication details

Authors
Joseph Prisco; Grant Stewart; Herbert Huber; Randy Rannow; Jason Hick; Dave Martinez; Brandon Hong; Aditya M. Deshpande
Publisher
IEEE / Energy Efficient High Performance Computing Working Group
Year
2020
Document language
English
Source type
Scientific
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Public PDF on contributing national-laboratory research repository downloaded; IEEE copyright and restrictions printed onp.519. Citation-only; public availability does not grant redistribution.

Citation

Joseph Prisco; Grant Stewart; Herbert Huber; Randy Rannow; Jason Hick; Dave Martinez; Brandon Hong; Aditya M. Deshpande (2020). Investigative Report on Electrical Commissioning in HPC Data Centers. IEEE / Energy Efficient High Performance Computing Working Group. https://doi.org/10.1109/CLUSTER49012.2020.00074

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.