Technical guideFree to read2026

24/7 Renewables: The Economics of Firm Solar and Wind

Original title 24/7 renewables: The economics of firm solar and wind

International Renewable Energy Agency (IRENA) · Saied Dardour, Deborah Ayres et al.

IRENA's May 2026 report measures the cost of round-the-clock solar, wind and battery power with a firm LCOE: about USD 54-82/MWh in favourable regions in 2025, falling below USD 50/MWh by 2035.

On this page

Overview

The International Renewable Energy Agency (IRENA) report examines, at asset level, the cost of turning variable solar and wind output into a flat, continuous supply, known as firming. It introduces the firm LCOE (F-LCOE): the standalone LCOE plus a firming premium for storage, generation overbuild and complementary renewables. The default reliability target is 95%, a simplified energy-based measure of how much annual demand the project can meet, which differs from power system reliability.

The report notes that between 2010 and 2024 installed costs fell 87% for solar PV (USD 708/kW), 55% for onshore wind (USD 1,066/kW) and 93% for battery storage (from USD 2,634 to USD 197/kWh). Firm LCOE for solar-plus-battery configurations fell from above USD 100/MWh in 2020 to about USD 54-82/MWh in 2025 in favourable regions. Under current assumptions a further drop of roughly 30% by 2030 and 40% by 2035 is projected.

China sets the global cost floor: most of 252 utility-scale solar projects commissioned in 2024 can deliver firm electricity below USD 100/MWh, with minimum values of USD 30/MWh at 90% reliability and about USD 46/MWh at 99%. The UAE's Al Dhafra complex will combine 5.2 GW of solar with 19 GWh of batteries to deliver a firm 1 GW at about USD 70/MWh. The report names data centres and AI workloads among users needing uninterrupted, high-quality power.

The report carries two caveats: it does not advocate firm, continuous supply as a universal objective, and the flat output profile is a modelling assumption, not an operating prescription. F-LCOE should be read as a conservative project-level upper bound for grid-constrained or islanded cases, since system-level integration usually delivers comparable reliability more cheaply. It also discusses the move from annual matching to hourly and location-matched accounting.

Key points

  1. F-LCOE is the standard LCOE plus a firming premium (storage, overbuild, complementary sources); the default reliability target is 95%.
  2. Installed cost declines 2010-2024: solar PV 87% (USD 708/kW), onshore wind 55% (USD 1,066/kW), batteries 93% (USD 197/kWh).
  3. Solar-plus-battery firm LCOE was above USD 100/MWh in 2020 and is about USD 54-82/MWh in favourable regions in 2025.
  4. Declines of about 30% by 2030 and about 40% by 2035 are projected, taking the best sites below USD 50/MWh.
  5. In China most of 252 solar projects can deliver firm electricity below USD 100/MWh; the minimum is USD 30/MWh at 90% reliability and USD 46/MWh at 99%.
  6. At high-quality sites in Brazil, India, Australia and South Africa, 2025 firm LCOE is about USD 65-82/MWh against unfirmed LCOE of USD 29-39/MWh.
  7. In the US, financing costs, interconnection charges and permitting complexity keep firm costs above other regions.
  8. Al Dhafra: 5.2 GW of solar and 19 GWh of batteries for a firm 1 GW, estimated at about USD 70/MWh.
  9. Batteries are modelled as four-hour lithium-ion systems; the flat output profile is a proxy for continuous consumers such as data centres.

Using it in design

  • When evaluating 24/7 renewable supply for a data centre, compare the firm LCOE of a solar, wind and battery hybrid portfolio at the regional resource quality against this report's ranges.
  • When choosing an hourly matching target (for example 90%, 95%, 99%), assess how cost rises with the reliability target using China's move from USD 30 to USD 46/MWh.
  • On grid-constrained sites, examine co-locating solar, wind and battery at one connection point as a way to use connection capacity more efficiently.
  • Use the figures as an upper-bound benchmark rather than a project quote; real cost depends on site resource, financing and connection charges.
  • Frame corporate clean-energy commitments around possible hourly and location-based matching rather than annual matching.

Who should read it

Investors, energy procurement teams and policy analysts setting data-centre power supply and sustainability strategy.

Document contents

  1. Executive summary
  2. 1. The rise of round-the-clock renewable power (beyond LCOE: why a system perspective matters; from system models to project-level benchmarks)
  3. 2. The economics of firm renewable power (firm LCOE, comparison across markets, competitiveness with fossil fuels, cost drivers)
  4. 3. From cost competitiveness to deployment at scale (technology learning, matching technology to context, the role of policy)
  5. Annexes: firm LCOE methodology, capital and operating expenditure, project timeline and financing assumptions

Publication details

Authors
Saied Dardour; Deborah Ayres; Lourdes Zamora
Publisher
International Renewable Energy Agency (IRENA)
Year
2026
Document number
ISBN 978-92-9260-736-4
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official PDF opened via web and copyright page 2 inspected: IRENA permits reuse/copying with acknowledgement, except separately attributed third-party material. Publisher HTML landing https://www.irena.org/Publications/2026/May/24-7-renewables-The-economics-of-firm-solar-and-wind was opened/attempted but returned 403 in web and TinyFish; licence evidence is the actual publication, not successful HTML access. Round 2 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Saied Dardour; Deborah Ayres; Lourdes Zamora (2026). 24/7 renewables: The economics of firm solar and wind. International Renewable Energy Agency (IRENA). ISBN 978-92-9260-736-4. https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/May/IRENA_TEC_24-7_renewables_2026.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.