Biomass Power Generation and Energy Management in Smart Grid-Connected Data Centers: A Comprehensive Review and Alignment Framework
Sustainability (MDPI AG) · Richard Penneigh, Raj Bridgelall et al.
Sustainability (MDPI) 2026 review of 347 peer-reviewed sources: constraints on biomass for data centres reflect temporal and operational misalignment rather than technological infeasibility, with feedstock logistics creating persistent availability gaps.
On this page
Overview
The review examines biomass power generation, data centre energy management and smart grid integration across 347 peer-reviewed sources. A staged analytical design separates demand characterisation from supply evaluation; Latent Dirichlet Allocation topic modelling is validated with BERTopic and VOSviewer network analysis. Four thematic clusters were identified, and no single topic spans data-centre reliability requirements, biomass supply dynamics and smart grid integration at once, pointing to an underexplored area in the literature.
The study introduces a demand-supply-grid alignment framework showing compatibility conditions across temporal resolution, reliability requirements and grid management. An illustrative application shows that biomass feedstock logistics constraints create persistent availability gaps at data-centre operational timescales, suggesting supply chain resilience and grid-mediated buffering are likely necessary conditions. The framework and simulation are offered as starting points for future engineering and empirical work, not as demonstrations of operational readiness.
Key points
- Review of 347 peer-reviewed sources using LDA, BERTopic and VOSviewer analysis.
- Four thematic clusters were found, with no single topic covering data-centre reliability, biomass supply and smart grid integration together.
- The demand-supply-grid alignment framework covers temporal resolution, reliability and grid management dimensions.
- Biomass feedstock logistics create persistent availability gaps at data-centre operational timescales.
- Integration constraints reflect temporal and operational misalignment rather than technological infeasibility.
- The framework and simulation are starting points for future work, not evidence of operational readiness.
Using it in design
- When evaluating biomass or biogas-based backup or baseload generation, include fuel logistics and availability gaps explicitly in the reliability analysis.
- For biomass-based supply, make grid-mediated buffering (grid connection, storage) part of the architecture decision.
- Use the review's findings as an analytical frame for pre-feasibility, not as an operationally proven architecture.
Who should read it
Energy planners and researchers evaluating dispatchable low-carbon energy sources for data centres.
Publication details
- Authors
- Richard Penneigh; Raj Bridgelall; Joseph Szmerekovsky
- Publisher
- Sustainability (MDPI AG)
- Year
- 2026
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- CC BY 4.0: share with attribution
Original licence note
Article-specific publisher copyright/rights statement explicitly grants CC BY; version 4.0 is corroborated by publisher-deposited Crossref license metadata. Third-party material may have separate rights. Round 3/4 ingestion retains bibliographic metadata only; no local full text is redistributed.
Citation
Richard Penneigh; Raj Bridgelall; Joseph Szmerekovsky (2026). Biomass Power Generation and Energy Management in Smart Grid-Connected Data Centers: A Comprehensive Review and Alignment Framework. Sustainability (MDPI AG). https://doi.org/10.3390/su18126141