Biomass Power Generation and Energy Management in Smart Grid-Connected Data Centers: A Comprehensive Review and Alignment Framework

Sustainability (MDPI AG) · Richard Penneigh, Raj Bridgelall et al.

Sustainability (MDPI) 2026 review of 347 peer-reviewed sources: constraints on biomass for data centres reflect temporal and operational misalignment rather than technological infeasibility, with feedstock logistics creating persistent availability gaps.

On this page

Overview

The review examines biomass power generation, data centre energy management and smart grid integration across 347 peer-reviewed sources. A staged analytical design separates demand characterisation from supply evaluation; Latent Dirichlet Allocation topic modelling is validated with BERTopic and VOSviewer network analysis. Four thematic clusters were identified, and no single topic spans data-centre reliability requirements, biomass supply dynamics and smart grid integration at once, pointing to an underexplored area in the literature.

The study introduces a demand-supply-grid alignment framework showing compatibility conditions across temporal resolution, reliability requirements and grid management. An illustrative application shows that biomass feedstock logistics constraints create persistent availability gaps at data-centre operational timescales, suggesting supply chain resilience and grid-mediated buffering are likely necessary conditions. The framework and simulation are offered as starting points for future engineering and empirical work, not as demonstrations of operational readiness.

Key points

  1. Review of 347 peer-reviewed sources using LDA, BERTopic and VOSviewer analysis.
  2. Four thematic clusters were found, with no single topic covering data-centre reliability, biomass supply and smart grid integration together.
  3. The demand-supply-grid alignment framework covers temporal resolution, reliability and grid management dimensions.
  4. Biomass feedstock logistics create persistent availability gaps at data-centre operational timescales.
  5. Integration constraints reflect temporal and operational misalignment rather than technological infeasibility.
  6. The framework and simulation are starting points for future work, not evidence of operational readiness.

Using it in design

  • When evaluating biomass or biogas-based backup or baseload generation, include fuel logistics and availability gaps explicitly in the reliability analysis.
  • For biomass-based supply, make grid-mediated buffering (grid connection, storage) part of the architecture decision.
  • Use the review's findings as an analytical frame for pre-feasibility, not as an operationally proven architecture.

Who should read it

Energy planners and researchers evaluating dispatchable low-carbon energy sources for data centres.

Publication details

Authors
Richard Penneigh; Raj Bridgelall; Joseph Szmerekovsky
Publisher
Sustainability (MDPI AG)
Year
2026
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Article-specific publisher copyright/rights statement explicitly grants CC BY; version 4.0 is corroborated by publisher-deposited Crossref license metadata. Third-party material may have separate rights. Round 3/4 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Richard Penneigh; Raj Bridgelall; Joseph Szmerekovsky (2026). Biomass Power Generation and Energy Management in Smart Grid-Connected Data Centers: A Comprehensive Review and Alignment Framework. Sustainability (MDPI AG). https://doi.org/10.3390/su18126141

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.