The Protection of Data Centres: Economic and Environmental Consideration of the Alternative Technologies Available

Johnson Controls · A. Elder, T. R. Nichols

A 2018 Johnson Controls white paper comparing sprinkler, water mist, gaseous and hypoxic protection: FM's HC-2 class for data centres calls for 8 mm/min over 230 m2, and hypoxic systems are not viewed as practical for positively pressurised halls.

On this page

Overview

Written by A. Elder and Dr T. R. Nichols, the paper summarises the relative merits, costs and environmental influences of data-centre fire suppression and detection options. It says system choice has historically been shaped by consultants, manufacturers and experience, and should instead follow a risk assessment. Questions include which areas are protected, loss criteria, whether every cabinet is critical, and the effect of water on sensitive components that cannot be powered down. Suitability criteria are storage space, installation and maintenance cost, water and venting infrastructure, post-event refill cost, insurer requirements and environmental effects.

On sprinklers, under EN 12845 ordinary hazard 1 requires a 72 m2 area; an insurer's minimum expectation for data centres is ordinary hazard, meaning 5 mm/min over 216 m2, possibly higher because of airflow and hot or cold aisle containment. FM requirements are more onerous and were recently classified HC-2: over three times the design area and 60% higher water density (8 mm over 230 m2). Data halls use pre-action sprinklers. Water mist brings less water and smaller tank and pipe sizes than sprinklers and is the only practical alternative to carbon dioxide for diesel generators, but it is manufacturer dependent; FM's data-centre test protocol (HC-2) is recommended as the minimum approval.

Gaseous systems are actuated by smoke detection and are therefore very fast, with total discharge between 10 seconds and 2 minutes depending on the gas. Halocarbon agents (FK-5-1-12 or Novec 1230, HFC-227ea or FM200) discharge in 10 seconds at design concentrations of 4.5% to 8.5% by volume. HFCs fall under F-gas regulation while Novec 1230 is exempt for its negligible global warming potential. Inert gas systems store gas at 150, 200 or 300 bar and reduce oxygen below 15%; discharge typically takes 60 to 120 seconds, and longer times reduce pressure relief area. The detection section covers triple sensing technology, aspirating detection and hydrogen detection in battery rooms.

In hypoxic systems ambient oxygen is typically held at 15% so a fire cannot start. They suit archives and museums but are not recommended for data centres: they cannot cope with leakage from positive pressurisation, compressors can exceed 200 kW and running cost is high. The paper is a manufacturer document that highlights its own product names, and concludes by recommending that insurers be consulted.

Key points

  1. System choice should come from a risk assessment; more than one protection type may be needed for different areas.
  2. EN 12845 ordinary hazard 1: 72 m2 area; insurer expectation of ordinary hazard means 5 mm/min over 216 m2; one sprinkler typically covers 12 m2 (at least 6 nozzles).
  3. FM data-centre class HC-2: over three times the design area and 60% higher water density (8 mm over 230 m2); FM DS 5-32 changed accordingly.
  4. Sprinklers in data halls are pre-action type; sprinklers do not penetrate cabinets and are for control, property and life safety.
  5. Water mist runs below 15 bar (low pressure) or above 70 bar (high pressure); water density of 1.6 to 2.1 mm/m2 for Class A is much less than sprinklers.
  6. Water mist is the only practical alternative to carbon dioxide for local protection of diesel generators; FM's data-centre test protocol is recommended as minimum approval.
  7. Halocarbon discharge takes 10 seconds with design concentrations of 4.5% to 8.5% by volume; HFCs are covered by F-gas regulation.
  8. Inert gas systems store at 150, 200 or 300 bar, reduce oxygen below 15%, and discharge in 60 to 120 seconds.
  9. Hypoxic systems hold oxygen at about 15%; not recommended as a practical solution for positively pressurised data centres because of leakage.

Using it in design

  • Base the choice of suppression system on a risk assessment covering cabinet criticality, effect of water on sensitive components, post-event refill cost and insurer requirements.
  • If the insurer is FM Global, calculate the HC-2 design density (8 mm/min, 230 m2) and water infrastructure sizes early for the data hall.
  • For gaseous systems, include pressure relief dampers for the enclosure pressure rise; note that a longer inert gas discharge time reduces the relief area.
  • Verify that hot and cold aisle containment does not interfere with detection and suppression effectiveness, especially in retrofits.
  • Include hydrogen detection in battery rooms, and do not choose hypoxic protection for positively pressurised halls without a leakage calculation.

Who should read it

Engineers, consultants and insurers selecting and specifying data-centre fire suppression and detection systems.

Document contents

  1. Introduction
  2. Risk Assessment
  3. System Suitability
  4. Sprinkler Systems
  5. Water Mist Systems
  6. Gas Extinguishing Systems
  7. Detection
  8. Hypoxic Systems
  9. Cost/Benefit Analysis
  10. Summary

Related standards

  • EN 12845
  • FM Global DS 5-32
  • TS EN 14972
  • NFPA 750
  • NFPA 2001
  • ISO 14520

Publication details

Authors
A. Elder; T. R. Nichols
Publisher
Johnson Controls
Year
2018
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

© 2018 Johnson Controls. All rights reserved (p. 2)

Citation

A. Elder; T. R. Nichols (2018). The Protection of Data Centres: Economic and Environmental Consideration of the Alternative Technologies Available. Johnson Controls. https://johnsoncontrols.co.uk/-/media/project/jci-global/johnson-controls/uki-region/united-kingdom/insights/2022/whitepapers/files/wp-data-centre-white-paper.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.