EMC-aware validation of a distributed measurement system for intelligent air-handling units in data centers
Universidad Rey Juan Carlos repository / Measurement · Lucía López-García, Marcos Delgado et al.
A 2026 Measurement paper validates the CyberHandler-3 air-handler measurement chain: mean latencies of 50 ms (MQTT), 75 ms (Modbus RTU) and 120 ms (Grafana), with analog deviations above 8 V on the 0-10 V input.
On this page
Overview
The study proposes and applies a field validation method for the distributed measurement system in CyberHandler-3, an intelligent air-handling unit for data centres. The system combines 0-10 V and RS485 interfaces, distributed DeepOPTA acquisition nodes, Wi-Fi/MQTT communication, local edge buffering, time-series storage and visualisation. Its contribution is to separate the metrological evaluation of the analog acquisition path from the temporal, communication and data-handling performance of the whole system.
The method formalises the measurement chain and evaluates three things separately: the analog acquisition path, stage-specific communication and visualisation latencies, and the electromagnetic environment under representative operating conditions. A GUM-style uncertainty budget is built for the analog path; for the 12-bit ADC the quantisation step is 2.44 mV with a standard uncertainty contribution of 0.70 mV. Voltage, power in dB and latency in milliseconds are deliberately not merged into one figure of merit.
In the results the 0-10 V path is approximately linear over most of its range but deviates above 8 V, so a single linear calibration model may not suffice and a piecewise-linear correction is suggested. Mean latencies are 50 ms for MQTT transmission, 75 ms for Modbus RTU transactions and 120 ms for Grafana refresh; these are stage-specific indicators and should not be read as end-to-end latency. Latency standard deviation is reported as 12.4 ms.
In the electromagnetic survey the 2.4 GHz band shows an ambient interference level near -65 dBm against a noise floor near -70 dBm, a margin of about 5 dB. The authors describe the work as an in-situ pre-compliance assessment, not formal radiated-immunity certification. The system was validated under operating conditions at the Stulz Tecnivel facilities.
Key points
- Measurement chain: 0-10 V and RS485 interfaces, five DeepOPTA PLC nodes, Wi-Fi/MQTT, local edge buffer, time-series database and Grafana visualisation.
- Mean latencies: MQTT transmission 50 ms, Modbus RTU transaction 75 ms, Grafana refresh 120 ms; all are stage-specific values.
- Reported latency standard deviation (jitter) is 12.4 ms.
- ADC quantisation step is 2.44 mV (10 V over 4095), contributing 0.70 mV standard uncertainty.
- Calibration shows deviation above 8 V on the 0-10 V input; piecewise-linear correction is proposed for later use.
- Ambient interference in the 2.4 GHz band is about -65 dBm, noise floor about -70 dBm, margin about 5 dB.
- Wi-Fi transceiver-reported RSSI estimates range from -69 to -98 dBm and are chipset-dependent.
- The EMC work is an in-situ pre-compliance assessment and does not replace formal radiated-immunity certification.
Using it in design
- For air-handler sensor chains with analog 0-10 V inputs, verify calibration over the full range and plan a piecewise correction if the upper end deviates.
- Specify monitoring latency per stage (transport, field bus, visualisation) and confirm any end-to-end figure with a timestamped test.
- If wireless sensors are used, include a 2.4 GHz interference survey in the commissioning scope.
- Where certification is required, put electromagnetic testing in the specification as a separate accredited test.
Who should read it
Data-centre BMS and monitoring designers, air-handler manufacturers and commissioning engineers who validate measurement systems.
Document contents
- Introduction
- Materials and methods: system architecture, measurement model, uncertainty evaluation
- Electromagnetic characterization
- Results and discussion
- Impact on the CyberHandler-3 project
- Comparison with related IoT-based monitoring systems
- Conclusions
Publication details
- Authors
- Lucía López-García; Marcos Delgado; Robert Novak; Julio Ramiro Bargueño; David Iglesia; María Del Prado Diaz De Mera Sánchez; Mª Cristina Rodríguez-Sánchez
- Publisher
- Universidad Rey Juan Carlos repository / Measurement
- Year
- 2026
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Public institutional repository and linked PDF inspected; no document-specific redistribution license found in examined text. Repository open-access label alone is insufficient.
Citation
Lucía López-García; Marcos Delgado; Robert Novak; Julio Ramiro Bargueño; David Iglesia; María Del Prado Diaz De Mera Sánchez; Mª Cristina Rodríguez-Sánchez (2026). EMC-aware validation of a distributed measurement system for intelligent air-handling units in data centers. Universidad Rey Juan Carlos repository / Measurement. https://doi.org/10.1016/j.measurement.2026.123211
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.